Double-layer overlapped goaf blasting treatment method
A treatment method and goaf technology, applied in blasting and other directions, can solve problems such as complex procedures and low efficiency, and achieve the effects of simple operation, high safety, and reduced processing difficulty
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] The rock mass in the double-layer goaf is mainly composed of phyllite with a rock density of 1300-1800kg / m 3 , the Platts firmness coefficient is 10, the length of the upper roof of the upper gob is 100 m, the width is 50 m, the thickness of the roof is 11-20 m, the length of the lower roof is 150 m, the width is 80 m, the thickness of the lower roof is 10-16 m, and the upper roof is 10-16 m thick. The height from the lower roof is 35 m.
[0034] Concrete process implementation steps are as follows:
[0035] 1) According to the measured data, blastholes 31 and penetration holes 2 on the roof of the upper goaf are arranged. The blast hole is 1 m from the boundary of the overlapping area;
[0036] 2) According to the measured data, the blastholes on the roof of the lower goaf in the overlapping area are arranged, and the penetration holes 2 are arranged in the overlapping area of the upper goaf. The penetration holes are 1.5 m away from the blastholes in the upper goa...
Embodiment 2
[0045] The rock mass in the double-layer goaf is mainly composed of magnetite quartzite with a rock density of 3300-3400 kg / m 3 , the Platts firmness factor is 12-16, the length of the upper gob is 90 m, the width is 50 m, the thickness of the roof is 11-20 m, the length of the lower roof is 80 m, the width is 80 m, and the thickness of the lower roof is 13-18 m. The height between the upper roof and the lower roof is 30 m.
[0046] Concrete process implementation steps are as follows:
[0047] 1) According to the measured data, blastholes 31 and penetration holes 2 on the roof of the upper goaf are arranged. The blast hole is 1 m from the boundary of the overlapping area;
[0048] 2) According to the measured data, the blastholes on the roof of the lower goaf in the overlapping area are arranged, and the penetration holes 2 are arranged in the overlapping area of the upper goaf. The penetration holes are 1.5 m away from the blastholes in the upper goaf. Between the horiz...
Embodiment 3
[0057] The rock mass in the double-layer goaf is mainly composed of granite with a rock density of 2700-3000 kg / m 3 , the Platts firmness factor is 10, the length of the upper gob is 90 m, the width is 50 m, the thickness of the roof is 14-18 m, the length of the lower roof is 100 m, the width is 70 m, the thickness of the lower roof is 12-17 m, the upper roof is The height from the lower roof is 40 m.
[0058] Concrete process implementation steps are as follows:
[0059] 1) According to the measured data, blastholes 31 and penetration holes 2 on the roof of the upper goaf are arranged. The blast hole is 1 m from the boundary of the overlapping area;
[0060] 2) According to the measured data, the blastholes on the roof of the lower goaf in the overlapping area are arranged, and the penetration holes 2 are arranged in the overlapping area of the upper goaf. The penetration holes are 1.5 m away from the blastholes in the upper goaf. Between the horizontal lines of the hol...
PUM
Property | Measurement | Unit |
---|---|---|
Density | aaaaa | aaaaa |
Density | aaaaa | aaaaa |
Density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com