Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Engineering construction multi-dimensional dynamic information fusion and cooperation interactive system

A dynamic information and interactive system technology, applied in the direction of instruments, geometric CAD, computing, etc., can solve the problem of inability to realize real-time data collection, software control, hardware equipment interaction, inability to realize dynamic interactive data exchange in related resource libraries, and inability to transmit information Problems such as all the information of the model can achieve the effect of realizing the interaction of software control and hardware equipment, realizing real-time data collection, and solving the technical difficulties of complex construction on site

Pending Publication Date: 2018-11-30
武汉八维时空信息技术股份有限公司
View PDF5 Cites 28 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] At present, the application of BIM technology in the market is still limited to low-end applications that import simple 3D models into engines such as VR for display, and cannot transmit all the information contained in the information model, making the model information not comprehensive and accurate when displayed; and The 3D model library can only perform functions such as simple stacking and placement of static 3D models, and cannot realize dynamic and interactive data exchange of related resource libraries, nor can it realize real-time data collection and interactive software control hardware devices
[0005] At present, the leading parties in the use of management systems based on BIM technology in the market are generally limited to the central server, and only the central server can participate in the database records, which is not flexible enough and inefficient in actual use.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering construction multi-dimensional dynamic information fusion and cooperation interactive system
  • Engineering construction multi-dimensional dynamic information fusion and cooperation interactive system
  • Engineering construction multi-dimensional dynamic information fusion and cooperation interactive system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0038] Such as Figures 1 to 4 As shown, this embodiment provides a multi-dimensional dynamic information fusion and collaborative interaction system for engineering construction, including a professional system, a data management system, a progress management system, a positioning system, a monitoring system, a BIMVR system, a communication system, and a construction system; the professional system It is used to construct three-dimensional models of various construction projects in combination with the data management system, and send the three-dimensional model data to the BIMVR system; the data management system is used to store the building model information of various construction projects and the corresponding building models bill of quantities information, and provide corresponding building model information for the professional system; the progress management system uses a non-linear management mode to manage the construction progress of the construction site, and the p...

Embodiment 2

[0060]This embodiment provides a multi-dimensional dynamic information fusion and collaborative interaction system for engineering construction. The difference from the above-mentioned embodiment 1 is that this embodiment considers that too many node information concurrently sent to engineering data will cause too many parallel rendering engines. Cause real-time rendering blockage. On the one hand, according to the law of increasing frequency of engineering information update, a total of 6 levels of rendering engines are customized, including engineering data management level, progress management level, cost control level, implementation level, supervision and monitoring level, and sensor network level. The engine start frequency is from 5 minutes / level to 1 day / level, which disperses the transmission of engineering data. On the other hand, the wireless sensor network model based on quality of service (QoS) is used in the sensor network-level rendering engine, which also reduc...

Embodiment 3

[0062] This embodiment provides a multi-dimensional dynamic information fusion and collaborative interaction system for engineering construction. The difference from the above-mentioned embodiments 1 and 2 is that in order to ensure the versatility of this system in the construction field, the software of this system collects water conservancy, electric power, transportation There are more than 2,100 engineering tools in 7 categories including construction, underground engineering, petroleum, and agriculture, such as three-dimensional planting systems, fasteners, and suspension bridge main cables. Each type of engineering tool has the same operability as the real thing. The engineering tools described cover a wide range and cover all types, forming a unique knowledge system and realizing the visualization of engineering feasibility. In the software, more than 700 examples of dynamic component libraries have been newly built, such as traffic lights, boarding platforms, etc., and...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an engineering construction multi-dimensional dynamic information fusion and cooperation interactive system, comprising a professional system, a data management system, a progress management system, a positioning system, a monitoring system, a BIMVR system, a communication system and a construction system. The professional system, the data management system and the BIMVR system are combined to built a simulation engineering model and actual construction site scenes and the simulation engineering three-dimensional model are combined to achieve data interaction, thus, real-time data acquisition and interaction between software and hardware equipment under control of the software are both achieved. A non-linear management mode is utilized to manage construction progress, last-minute changes of progresses can be adjusted in any time, and progress management is much flexible and convenient. A block chain technique is utilized for data management, particularly, multi-point mesh block structure is built through the block chain technique, all terminals participates recording of a database, and thus, safety and flexibility in use of the whole system is guaranteed effectively.

Description

technical field [0001] The invention belongs to the technical field of intelligent construction engineering, in particular to an engineering construction multi-dimensional dynamic information fusion and collaborative interaction system. Background technique [0002] After decades of development, my country's civil engineering industry has made great progress in technical and management capabilities. However, as a labor-intensive and traditional technology-dominated state, it has not been substantially changed and improved for a long time. Through high-tech The application of the technology to upgrade the technology and management of the civil engineering industry and realize the intelligence of the whole construction process is the only way to realize the new development of the civil engineering industry. [0003] Building Information Modeling (Building Information Modeling BIM) is a new technology that is developing internationally. It represents the development direction of...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50G06T19/00
CPCG06T19/003G06T2210/04G06F30/13
Inventor 罗德纯罗德龙
Owner 武汉八维时空信息技术股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products