Cr1-series hot work die steel and heat treatment method thereof
A technology of hot work die steel and heat treatment method, applied in the field of iron-based alloys, which can solve the problems of easy cracking, poor thermal strength and wear resistance of 5CrNiMo die steel, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0100] The preparation method of Cr1 series hot working die steel is characterized in that it comprises steps: electric furnace smelting, LF furnace refining (LADLE FURNACE is the ladle refining furnace), vacuum degassing (VD), die casting, annealing, electroslag remelting (ESR ), slow cooling, annealing, forging, normalizing, high temperature tempering, hydrogen expansion, roughing, inspection, finishing, quenching and tempering, finishing, inspection, and put into production to obtain modules or molds.
[0101] By controlling the composition of molten steel, the prepared die steel contains C0.43%, Si0.23%, Mn0.90%, P0.003%, S0.001%, Cr0.93%, Ni1. 41%, Mo1.03%, V0.16%, Al0.020%, Nb0.03%, the balance Fe. and inevitable inclusions.
Embodiment 2
[0103] The method of smelting is with embodiment 1. By controlling the composition of molten steel, the prepared mold steel contains 0.44% C, 0.36% Si, 0.88% Mn, 0.007% P, 0.002% S0, 0.93% Cr, 1.54% Ni, Mo1. 45%, V 0.17%, Al 0.030%, Nb 0.039%, the balance of Fe and inevitable inclusions.
Embodiment 3
[0105] The mold was prepared by heat treatment with the steel of Example 2YD1, and the specification was: 1000×910×270.
[0106] The heat treatment process is:
[0107]S1 Quenching: Furnace at ≤680°C, keep isothermal at 680°C, the isothermal time is calculated according to the effective size of the workpiece (the same below) as 0.6min / mm, and the temperature rises to 890-930°C with the furnace, and the holding time is 1.2min / mm Calculate, the oil is cooled for 60-70 minutes, and tempered immediately after cooling to 150-180 °C after the oil is released;
[0108] S2 Primary tempering: Furnace at ≤280°C, keep at 280°C and the isothermal time is calculated as 0.6min / mm, (under laboratory conditions, the temperature of Φ25mm samples is usually 10-50°C higher than that under industrial conditions) and heat up to 540~ 640°C, the holding time is calculated according to 2.4min / mm, oil cooling until the surface temperature is 100-150°C and then cooling (there are various cooling metho...
PUM
Property | Measurement | Unit |
---|---|---|
Impact toughness | aaaaa | aaaaa |
Longitudinal impact work | aaaaa | aaaaa |
Lateral impact energy | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com