An ecological slope protection structure for ionic rare earth mines
An ionic rare earth, ecological slope protection technology, applied in infrastructure engineering, horticulture, botanical equipment and methods, etc., can solve the problems of high engineering cost, easy deformation of soil, washed away by rainwater, etc., to improve shear strength. , Improve the anti-skid ability and reduce the effect of sliding force
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] The width of the bottom of the slope is 38 meters, the height of the slope is 6 meters, and the length of the slope surface is 8.5 meters.
[0040] like figure 1 As shown, the present invention includes a bamboo frame 1, a bamboo stake 2, a drainage pipe 3, a tree 4, a drainage ditch 5 at the bottom of the slope, and a drainage ditch on the side of the slope. The bamboo frame 1 is placed on the side slope slope surface 7, the drainage pipe 3 is driven into the soil layer of the side slope slope surface 7 through the through holes 102 opened on the bamboo frame frame bars 101, and the bamboo pile 2 is driven into the side slope slope surface. 7 and grading and leveling 8, bamboo stakes 2 are driven into the upper and lower sides of the bamboo frame 1 at the same time, 4 kinds of trees are placed on the grading and leveling 8, and the bottom drainage ditch 5 is located at the bottom of the slope 6. The side drains are located on the upper, left and right edges of the slo...
Embodiment 2
[0055] The width of the bottom of the slope is 76 meters, the height of the slope is 10 meters, and the slope surface of the slope is irregular.
[0056] like Figure 4 As shown, the steps implemented in this embodiment are: (1) firstly, the slope body 9 is cut and leveled, and the side slope is repaired into two-level side slopes, each level of side slope slope is 5 meters high, and each level of side slope slope surface 7 The length is 7.07 meters, the slope angle is 45°, and the width of the leveling ground 8 between the two-level slopes is 4 meters. (2) The side drainage ditch is dug around the slope body 9 . (3) The slope bottom drainage ditch 5 is dug at the slope bottom 6. (4) While performing steps (1), (2) and (3), the bamboo frame frame strips 101 of the bamboo frame 1 are processed, and the bamboo stakes 2 and the drain pipes 3 are processed simultaneously. (5) Install the bamboo frame 1 on the slope surface 7 of the two-level side slope. (6) Install the drain p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com