Method for Smelting Ferrovanadium in Tilting Furnace
A technology of tilting furnace and ferrovanadium, which is applied in the field of metallurgy, can solve problems such as difficult control of alloy aluminum content and substandard product quality, and achieve the effect of reducing vanadium content and increasing yield
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0029] Raw material V that will meet production requirements 2 o 5 , V 2 o 3 , aluminum, iron, and lime are mixed and put into a tiltable electric arc furnace for smelting in three phases. The ratio of aluminum ratio A (phase 1) : B (phase 2) : C (phase 3) = 1.4 ︰1︰0.2, the multiple ratio of iron distribution X (Phase 1): Y (Phase 2): Z (Phase 3)=0.25︰2.25︰0.25, the raw material of Phase 1: flake vanadium (V 2 o 5 Mass content 98.0%) 1000kg, V 2 o 3(Containing vanadium 64.1%) 3000kg, with aluminum 2446kg, iron 569kg, lime 600kg. Mix the material evenly and put it into the furnace. The secondary voltage is 190V to energize and start the arc. After the furnace material is cleared, the secondary voltage is 150V. After smelting and electrifying for 60 minutes, the residual vanadium in the quick separation slag in front of the furnace is 0.07%, and the slag output is 3500kg; after that, the second phase raw material is added: V 2 o 3 (Containing vanadium 64.5%) 3000kg, mat...
Embodiment 2
[0032] Raw material V that will meet production requirements 2 o 5 , V 2 o 3 , aluminum, iron, and lime are mixed and put into a tiltable electric arc furnace for smelting in three phases. The ratio of aluminum ratio A (phase 1) : B (phase 2) : C (phase 3) = 1.4 ︰1︰0.2, the multiple ratio of iron distribution X (phase 1): Y (phase 2): Z (phase 3)=0.4︰2︰0.4, the raw material of phase 1: flake vanadium (V 2 o 5 Mass content 98.0%) 1000kg, V 2 o 3 (Containing vanadium 64.1%) 3000kg, with aluminum 2446kg, iron 910kg, lime 600kg. The secondary voltage is 190V and the arc is energized. After the charge is cleared, the secondary voltage is 150V. After smelting and electrifying for 60 minutes, the residual vanadium in the quick separation slag in front of the furnace is 0.09%, and the slag produced is 3550kg; after that, the second phase raw material is added: V 2 o 3 (containing 64.5% of vanadium) 3000kg, with 1260kg of aluminum, 3414kg of iron, 300kg of lime; the secondary ...
Embodiment 3
[0035] Raw material V that will meet production requirements 2 o 5 , V 2 o 3 , aluminum, iron, and lime are mixed and put into a tiltable electric arc furnace for smelting in three phases. The ratio of aluminum ratio A (phase 1) : B (phase 2) : C (phase 3) = 1.4 ︰1︰0.2, the multiple ratio of iron distribution X (Phase 1): Y (Phase 2): Z (Phase 3)=0.55︰1.75︰0.55, the raw material of Phase 1: flake vanadium (V 2 o 5 Mass content 98.2%) 1000kg, V 2 o 3 3000kg (containing 64.8% vanadium), with 2445kg of aluminum, 1249kg of iron and 600kg of lime. Mix the material evenly and put it into the furnace. The secondary voltage is 190V to energize and start the arc. After the furnace material is cleared, the secondary voltage is 150V. After smelting and electrifying for 60 minutes, the residual vanadium in the quick separation slag in front of the furnace is 0.11%, and the slag produced is 3700kg; after that, the second phase raw material is added: V 2 o 3 3000kg (containing 64...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com