A kind of oil well cement retarder and preparation method thereof
A technology of oil well cement and retarder, which is applied in the field of oil and gas well cementing, can solve the problems of poor temperature resistance and high temperature sensitivity, and achieve the effects of good adaptability, good compatibility, and good linearity of addition
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] 100 parts of water, 2 parts of sodium glucoheptonate dihydrate, 13 parts of platycodon polysaccharide, 0.2 part of glutaraldehyde, 1 part of concentrated hydrochloric acid, 5 parts of polyethylene glycol were added to the water, and heated to 80 °C under stirring, keeping After 2 hours, the oil well cement retarder was prepared.
Embodiment 2
[0028] 100 parts of water, 2 parts of sodium glucoheptonate dihydrate, 3 parts of sodium gluconate, 6 parts of white dextrin, 4 parts of yellow dextrin, 0.3 parts of glutaraldehyde, 3 parts of concentrated hydrochloric acid, polyethylene glycol 2 parts were heated to 70°C under stirring and kept for 2 hours to prepare oil well cement retarder.
Embodiment 3
[0030] 100 parts of water, 1 part of sodium glucoheptonate dihydrate, 15 parts of inulin, 0.1 part of glutaraldehyde, 2 parts of concentrated hydrochloric acid, 1 part of polyethylene glycol were added to the water, heated to 80 ° C under stirring, and kept After 1 hour, the oil well cement retarder was prepared.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com