Offshore snubbing electric pump lifting process string

A technology of process strings and electric pumps, which is applied in the direction of cable terminals, wellbore/well components, and wellbore/well valve devices, etc., which can solve the problem that cable packers and safety valve strings cannot adapt and affect snubbing Problems such as technology promotion and operation progress can be solved to achieve the effect of improving development effect, significant technical effect and economic benefit, and increasing oil production speed

Active Publication Date: 2016-05-11
CHINA PETROLEUM & CHEM CORP +1
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, well killing and workover are basically adopted in domestic offshore oil and water well operations, that is, killing fluid with reasonable well fluid density is injected into the annulus of the oil and water well casing through a high-pressure pump truck, so that the pressure of the wellbore fluid column of the oil and water well is greater than the formation pressure, avoiding Blowout occurs when the tubing string is tripped, but the method of killing the well has the following defects: 1. It is required to accurately grasp the data such as the geological pressure of the reservoir in the operating well, and the well control design must be absolutely accurate, which prevents the design from killing the well. If the liquid density is too small, it will cause blowout accidents, and it is necessary to prevent the designed killing fluid from entering the formation if the density of the designed killing fluid is too high, causing the formation to be polluted and the production to drop or even not produce oil; 2. During the well killing operation, the formation energy For larger wells, the formation energy will continuously accumulate pressure with the time of the killing force. When the pressure accumulates to a certain extent higher than the liquid column pressure produced by the wellbore killing fluid, blowout will occur. At this time, by increasing the killing fluid It is too late to restore the pressure balance at the bottom of the well, and the well must be shut down to stop the operation, and the operation progress is also greatly affected
However, this technology cannot adapt to the special marine environmental characteristics of offshore operations, platform working conditions, and the existing offshore wells are equipped with cable packers, safety valve strings, etc., which affects the promotion of snubbing technology in offshore oil wells. Technical problems to be solved in offshore oil and water well operations

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Offshore snubbing electric pump lifting process string
  • Offshore snubbing electric pump lifting process string
  • Offshore snubbing electric pump lifting process string

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] The detailed description and technical content of the present invention are described below with the accompanying drawings, but the accompanying drawings are only provided for reference and description, and are not intended to limit the present invention.

[0019] according to figure 1 As shown, an offshore snubbing electric pump lifting process string is composed of a production string and a control string that cooperate with each other. The control string includes a sand control and filter pipe 13 connected together from bottom to top, a filling seal Spacer 12, close-fitting device 11, pressure measuring and pressure transmitting cylinder 10, pressure transmitting capillary 5, downhole safety valve 9, hydraulic control pipeline 4, jointless collar casing 2, double-stage large cross 1, the pressure measuring The pressure transmission cylinder 10 is set at the lower end of the downhole safety valve 9, the close-fitting device 11 is set at the upper end of the packing pa...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an offshore no-killing electric pump lifting process pipe string. The pipe string comprises a control pipe string and a production pipe string which are mutually connected and matched, wherein the control pipe string comprises a sand preventing and filtering pipe, a pressure measuring and transferring cylinder and a no-coupling casing which are connected sequentially from bottom to top; the production pipe string is arranged in the no-coupling casing and comprises an electric pump unit, a check valve, a cable conversion device and a coiled tubing which are connected sequentially from bottom to top; a filling packer is connected between the sand preventing and filtering pipe and the pressure measuring and transferring cylinder, a densely inserting device is nested to the upper end part of the filling packer, and a guide step is arranged at the bottom of the densely inserting device; and a subsurface safety valve is connected between the pressure measuring and transferring cylinder and the no-coupling casing, and a variable-diameter guide step is arranged at the bottom of the no-coupling casing. According to the offshore no-killing electric pump lifting process pipe string, opening and closing of a flow path from the stratum to a wellhead of a down-hole are controlled through a mode that pressurization is performed by a ground hydraulic pump and pressure is transferred through a pilot-controlled pipeline, and operation such as no-killing pump inspection, pump change, downhole cable inspection and the like are performed on an offshore producing well.

Description

technical field [0001] The invention relates to an oil recovery pipe string, in particular to an offshore snubbing electric pump lifting process pipe string. Background technique [0002] Offshore oil and gas development is affected by the characteristics of the "high-tech, high-intensity, and high-risk" operating environment, and the technical requirements for well control operations are relatively high. At present, well killing and workover are basically adopted in domestic offshore oil and water well operations, that is, killing fluid with reasonable well fluid density is injected into the annulus of the oil and water well casing through a high-pressure pump truck, so that the pressure of the wellbore fluid column of the oil and water well is greater than the formation pressure, avoiding Blowout occurs when the tubing string is tripped, but the method of killing the well has the following defects: 1. It is required to accurately grasp the data such as the geological press...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21B43/00E21B34/10E21B47/06H02G15/04
Inventor 王民轩李敢刘玉国黄辉才车传睿于昭东曾凡春丛娟张雪梅
Owner CHINA PETROLEUM & CHEM CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products