Antiseepage leak-stopping organic grouting material used for landfill and application method
A technology for grouting materials and landfills, which is applied in chemical instruments and methods, and other chemical processes, and can solve problems such as expensive, single performance, and poor flexibility of organic grout materials
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0023] When the pH value of the clay in the anti-seepage layer of the landfill is 7, the temperature is 25°C, and after backwashing, the coverage rate of clay and other impurities remaining on the HDPE film is 50%, and the water content is 20%, according to:
[0024] 80 parts by weight of polyurethane;
[0025] Dichloromethane 20 parts by weight;
[0026] Stirring time 10 minutes;
[0027] Standing time 1 minute;
[0028] Curing time 2 days
[0029] Stir and mix evenly to obtain the high-performance organic grouting material of the present invention. Use a chemical grouting machine to pour it in, and then close the drill hole to prevent rainwater and other impurities from entering in order to protect the slurry material from solidification. After two days, the slurry material is basically solidified, and the repair is completed. Subsequent construction is possible.
[0030] The stirring process is divided into two processes: fast stirring and slow stirring. Fast stirring (...
Embodiment 2
[0032] When the pH value of the clay in the anti-seepage layer of the landfill is 6, the temperature is 10°C, and after backwashing, the coverage rate of clay and other impurities remaining on the HDPE film is 70%, and the water content is 40%, according to:
[0033] 70 parts by weight of polyurethane;
[0034] 30 parts by weight of dichloromethane;
[0035] Stirring time 6 minutes;
[0036] Standing time 1 minute;
[0037] Curing time 4 days
[0038] Stir and mix evenly to obtain the high-performance organic grouting material of the present invention. Use a chemical grouting machine to pour it in, and then close the borehole to prevent rainwater and other impurities from entering in order to protect the slurry material from solidification. After four days, the slurry material is basically solidified, and the repair is completed. Subsequent construction is possible.
[0039] Taking the anti-seepage layer of the landfill from top to bottom as follows: pebble layer, geotextile...
PUM
Property | Measurement | Unit |
---|---|---|
tensile strength at break | aaaaa | aaaaa |
elongation at break | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com