Construction method for connecting concrete thin-wall pipe pile by wooden supporting plate

A thin-walled pipe pile and construction method technology, applied in sheet pile wall, infrastructure engineering, construction, etc., can solve the problems of solid waste environment pollution, human health impact, high labor intensity, etc., to save labor, eliminate solid The effect of waste pollution and low labor intensity

Active Publication Date: 2011-06-15
浙江江河建设有限公司
View PDF1 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, 3 mm thick thin steel plates are used as supporting plates to connect piles. The thin steel plates need to be gas-cut and welded, which is time-consuming, labor-intensive, labor-intensive, costly, and easy to corrode. In addition, the solid waste generated during the gas-cutting process is harmful to the environment. Pollution and certain impact on human health

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for connecting concrete thin-wall pipe pile by wooden supporting plate
  • Construction method for connecting concrete thin-wall pipe pile by wooden supporting plate
  • Construction method for connecting concrete thin-wall pipe pile by wooden supporting plate

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0039] Example 1 as figure 1 As shown, when the end top elevation of pipe pile 6 is the design elevation, connect the pile with the following operation steps:

[0040] First make the skeleton steel bar 1, and weld the steel bar on the end of the pipe pile 6, and the end of the pipe pile 6 is equipped with a steel plate for welding; make the supporting plate 5, and use nine splints to make a diameter smaller than the pile pipe according to the size of the inner diameter of the pipe pile. For a pallet 5 with an inner diameter of 20 mm, saw four or six kerfs with a depth of 20 mm to 30 mm, which are used to embed the iron wire 4. The iron wire 4 used is 12# or 14# iron wire, and the length of the iron wire 4 is for the sinking of the pallet 5 The depth inside the pile tube is 500㎜ + the length of the steel bar binding at the pile end is 200㎜. Insert and adjust the length of the iron wire from the sawing seam so that the lengths of both ends are equal; then put the supporting plat...

Embodiment 2

[0041] Example 2 as figure 2 As shown, when the top elevation of the pipe pile 6 is lower than the design elevation, the following steps are used to connect the piles:

[0042]First dig out the soil above the pile end, the excavation hole is a circular hole or a square hole, the inner diameter of the circle or the square hole and the continuous length is the outer diameter of the pipe pile + 200 mm, and then rebuild the masonry protection hole 8, the bottom of which should be lower than the top of the pile 30㎜~50㎜, the top is at the same elevation as the cap or the bottom of the foundation beam, and its thickness is 120-240mm; then make the pile-connected skeleton steel bar 1 and weld it on the top steel plate of the pipe pile 6, the length of the steel bar is the anchorage of the cap length + masonry body protection height + welding length, when the masonry height exceeds 300mm, stirrups 7 can be added to fix it; then support plate 5 is made, and according to the size of the...

Embodiment 3

[0043] Example 3 as image 3 As shown, when the end top elevation of pipe pile 6 is greater than the design elevation, use the following steps to connect the pile:

[0044] First according to the design elevation requirement, cut the pile with a pile cutting machine such as a concrete cutter or a saw pile device, and the height of the pipe pile 6 is cut to the design height at one time, and the pile connecting skeleton reinforcement bar 1 and the stirrup bar 7 are made, because the top of the pipe pile 6 is There is no welded steel plate. According to the requirements of 2002 Zhejiang G22 "Detailed Drawing of Pile Top and Cap Connection (1)", the length of the pile connection is 1000 mm + the length of the extension into the cap, and two pieces are welded at 1m away from the lower end of the skeleton steel bar 1. φ20 to horizontally position the steel bar so that the skeleton steel bar does not fall off; then make the supporting plate 5, according to the size of the inner diam...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction method for connecting a concrete thin-wall pipe pile by a wooden supporting plate, and belongs to the technical field of civil construction industry. The construction method comprises the following steps of: 1) manufacturing frame steel bars used for connecting the pipe pile and a bearing platform or a foundation beam; 2) manufacturing the supporting plate used for supporting concrete; 3) welding the frame steel bars; 4) fixing the supporting plating by suing a No.12 or No.14 iron wire; and 5) casting pile connection concrete into the pipe pile to complete the pile connection construction process. When the concrete is cast into the pile, the iron wire is loosened by means of the self weight of the concrete and vibration force for vibrating the concrete, the wood board moves downwards under the action of gravity to from a gap, and a protective layer for the reinforced concrete is formed to protect the frame steel bars and prevent a thin steel supporting plate from being corroded so as to avoid corroding the frame steel bars; and the operation of gas cutting of the steel plate is avoided, the welding work is reduced, the processing is simple, the operation and construction are simple and convenient, time and labor are saved, the labor intensity is low, and the construction can be flexibly carried out.

Description

technical field [0001] The invention belongs to the technical field of civil construction industry, and in particular relates to an energy-saving, time-saving, environment-friendly, labor-saving and reusable construction method for connecting piles of concrete thin-walled pipe piles with wooden pallets. Background technique [0002] The pretensioned prestressed concrete thin-walled pipe pile has the advantages of high pile body strength, good pressure resistance and driving resistance, short construction and detection time, and fast speed. It has been widely used in the foundation of construction engineering in the past ten years. At present, 3 mm thick thin steel plates are used as supporting plates to connect piles. The thin steel plates need to be gas-cut and welded, which is time-consuming, labor-intensive, labor-intensive, costly, and easy to corrode. In addition, the solid waste generated during the gas-cutting process is harmful to the environment. Pollution and have...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/34E02D5/48
Inventor 冯葆蔚袁伟忠马德胜冯浏勍谢玲玲
Owner 浙江江河建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products