On-line maintenance method of accumulator capacity of direct current operative power source of substation
A technology for operating power supplies and batteries, which is applied in the repair/maintenance of secondary batteries, and can solve problems such as lack of maintenance of ministry or national standards, and achieve the effect of avoiding deep damage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] Embodiment 1: The online maintenance of the capacity of the storage battery of the DC operating power supply of the substation is carried out according to the following steps:
[0020] Detection: For substations with normal operating status, cut off the AC power supply, and the battery supplies power to the control cabinet independently, and use the battery reserve capacity detector to detect the load voltage value U of the battery one by one. F , and record, the voltage value displayed by the control cabinet should be continuously observed during detection, which is lower than the safe use standard voltage U A The battery should stop measuring immediately; for a battery with a rated voltage of 110V, it is safe to use the standard voltage U A It is 93V. For batteries with a rated voltage of 220V, it is safe to use the standard voltage U A is 186V. For the 12V conjoined battery used in UPS power supply, it is safe to use the standard voltage U A is 10V.
[0021] Repl...
Embodiment 2
[0026] Embodiment 2: On-line maintenance of battery capacity of substation DC operating power supply, the specific steps are:
[0027] Detection: For substations in normal operating state, cut off the AC power supply, and the battery supplies power to the control cabinet independently. The rated voltage of the battery is 110V. Use the battery reserve capacity detector to detect the load voltage value U of the battery one by one. F , and record, the voltage value displayed by the control cabinet should be continuously observed during the test, and the measurement should be stopped immediately when it is lower than 93V;
[0028] Replacement: put the load voltage value U F Replace the battery below 93V to ensure the balance of battery pack capacity;
[0029] Water replenishment: After adding water to the battery to the height of the plate, add water at a ratio of 500mL / 500Ah according to its structural capacity, and record the height of the liquid level at this time. Every time ...
Embodiment 3
[0031] Embodiment 3: In this embodiment, in the water replenishment step, add water according to the structural capacity of the battery at a ratio of 1500mL / 500Ah, in the charging step, adjust and calibrate the floating charge voltage to 110V, and the others are the same as in Embodiment 2.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com