Full-range sand-adding yield increase construction method for oil well
A construction method and a whole-process technology, applied in earthwork drilling, wellbore/well components, and production fluids, etc., can solve problems such as difficult-to-control joints, high sand plugging rate, and difficult fluid drainage, so as to save construction costs and reduce pollution , the effect of increasing benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] The construction method for the whole process of adding sand to increase production of the oil well includes the following steps: (1) Select volcanic rock cavernous or loose sandstone porous or fractured reservoirs, start the injection pump, and set a temperature of 1.5-2m 3 The initial displacement speed of / min is injected into the oil well through the injection tubing, and the displacement is gradually increased to 3-4.5m 3 / min; Gradually increase the injection pressure at the same time to gradually increase the casing pressure by 2-3Mpa; (2) When the injection volume reaches one or two injection tubing string volumes and the injection fluid enters the formation, start adding sand to the injection fluid Gradually increase the sand ratio, which refers to the percentage of the sand volume in the injection liquid to the volume of the injection liquid. The adjustment range of the sand ratio is controlled at 5-10%, and the sand volume is 2-3.5m. 3 ; At the same time graduall...
Embodiment 2
[0028] For volcanic cavernous reservoirs, the steps of the oil well's full sand addition and production stimulation construction method are as follows: ①Start the injection pump and set a 2m 3 / min initial displacement speed is injected into the oil well, and the displacement is gradually increased to 3-4.5m 3 / min, the displacement lifting speed is 2-2.5m 3 / 5min; At the same time, gradually increase the injection pressure to gradually increase the casing pressure by 2-3Mpa; ②When the injection volume reaches the volume of two injection pipe strings and the injection fluid enters the formation, start adding sand to the injection fluid. The starting sand ratio is 5% and gradually increase the sand ratio, the adjustment range of sand ratio is controlled within 5-10%, and the amount of sand reaches 2-3.5m 3 , In order to ensure that the artificial fracture length extends over the near-well zone; at the same time, the injection pressure is gradually increased to gradually increase the...
Embodiment 3
[0032] For volcanic cavernous reservoirs, the steps of the oil well's full sand addition and production stimulation construction method are as follows: ①Start the injection pump and set a temperature of 2m 3 The initial displacement speed of / min is injected into the oil well, and the displacement is gradually increased to 4m 3 / min, the displacement lifting speed is 2.2m 3 / 5min; At the same time, gradually increase the injection pressure to gradually increase the casing pressure by 2.5Mpa; ②When the injection volume reaches the volume of two injection pipe strings and the injection fluid enters the formation, start adding sand to the injection fluid, and the starting sand ratio is 5 % And gradually increase the sand ratio, the adjustment range of sand ratio is controlled within 5-10%, and the sand volume reaches 3m 3 , To ensure that the artificial fracture length extends over the near-well zone; at the same time, the injection pressure is gradually increased to gradually increa...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com