Synthesis of end amino phenylethylene/butadiene copolyer by tndcapping process and its method for preparing storage-stable modifie asphalt
A technology of amino-terminated styrene and modified asphalt, which is applied in the direction of building structure, building components, building insulation materials, etc., can solve problems such as no application reports, improve storage stability, improve compatibility, The effect of simple preparation process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0056] Use 2.2kg of cyclohexane with N 2 Press into the polymerizer, add a metered amount of styrene and preheat to 50°C, set THF / Li to 1.0, after adding THF, quickly add n-butyl lithium initiator to initiate the reaction for 30 minutes; according to the quality of the first stage styrene, Use a 1000ml croissant bottle to take a certain amount of pure liquid butadiene, use N 2 Press into the reaction kettle from the bottom of the kettle and react for 45 minutes; use N at the same temperature 2 The broken third stage of styrene was pressed into it, and the reaction was continued for 30 minutes, terminated with ethanol, and 1% antioxidant 264 was added. Then the solvent is removed, dehydrated and pressed into tablets to obtain SBS. GPC test shows that the molecular weight of the obtained SBS is 8.1×10 4 g / mol, the molecular weight distribution is 1.03.
Embodiment 2
[0058] Same as Example 1, the difference is that after the third stage of the styrene reaction is completed, the reaction temperature is reduced to 20°C, 1,5-diazabicyclo[3.1.0]hexane is added, and the reaction is conducted for 20 minutes. Stop with ethanol, add 1% antioxidant 264, remove solvent and water and press into tablets to obtain SBS-N. The test SBS end functionalization efficiency is 97%. The molecular weight of the tested SBS-N is 8.1×10 4 , The molecular weight distribution is 1.06. The mechanical properties are shown in Table 1.
Embodiment 3
[0061] Weigh 250g of asphalt and heat it to 160°C in a mixing container, add 16g of SBS sample, stir for 20min at a shear rate of 3700r / min, then add 3 parts of sulfur and heat to 180°C. Stirring is continued for 40 minutes at a shear rate of 3700r / min to make the SBS and asphalt mix evenly.
[0062] The conventional performance of SBS modified asphalt was tested according to the national standard, and the results are shown in Table 2.
[0063] SBS type
PUM
Property | Measurement | Unit |
---|---|---|
Molecular weight | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com