Foamed asphalt mixture and preparation method thereof
A foamed asphalt and mixture technology, which is applied in the field of foamed asphalt mixture and its preparation, can solve the problems of long heating time of asphalt and easy production of harmful substances, etc., and achieve the improvement of plastic deformation resistance, energy saving and environmental protection production and construction requirements, and improve work efficiency Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] A kind of foam asphalt mixture is prepared by the following steps:
[0050]Step 1: After mixing 10.5kg of SBS modified asphalt, 0.25kg of first component water and 85kg of old asphalt pavement milling material for 20s, add 2.4kg of cupro ammonia fiber, 1.5kg of antimony trioxide and 0.7kg of 2,2'-di Hydroxy-4,4'-dimethoxybenzophenone is then heated to 70°C and stirred for 40s to obtain primary foam asphalt mixture;
[0051] Step 2, mixing the primary foamed asphalt mixture with 0.25kg of the second component water for 35s, after secondary foaming, crushing and screening into A material with a particle size of 0-9.5mm and B material with a particle size of 9.5-19mm;
[0052] Step 3: Stir and mix 60kg of material A, 40kg of material B, 35kg of gravel and 1.2kg of cement in proportion for 40 seconds to obtain foamed asphalt mixture.
Embodiment 2
[0054] A kind of foam asphalt mixture is prepared by the following steps:
[0055] Step 1: After mixing 10.5kg of SBS modified asphalt, 0.25kg of first component water and 85kg of old asphalt pavement milling material for 30s, add 2.4kg of cupro ammonia fiber, 1.5kg of antimony trioxide and 0.7kg of 2,2'- After dihydroxy-4,4'-dimethoxybenzophenone, the temperature was raised to 90°C and stirred for 30s to obtain the primary foamed asphalt mixture;
[0056] Step 2, mixing the primary foamed asphalt mixture with 0.25kg of the second component water for 25s, after secondary foaming, crushing and screening into material A with a particle size of 0-9.5mm and material B with a particle size of 9.5-19mm;
[0057] Step 3: Stir and mix 60kg of material A, 40kg of material B, 35kg of gravel and 1.2kg of cement in proportion for 55s to obtain foamed asphalt mixture.
Embodiment 3
[0059] A kind of foam asphalt mixture is prepared by the following steps:
[0060] Step 1: After mixing 10.5kg of SBS modified asphalt, 0.25kg of first component water and 85kg of old asphalt pavement milling material for 25s, add 2.4kg of cupro ammonia fiber, 1.5kg of antimony trioxide and 0.7kg of 2,2'- After dihydroxy-4,4'-dimethoxybenzophenone, the temperature was raised to 81°C and stirred for 34s to obtain the primary foamed asphalt mixture;
[0061] Step 2, mixing the primary foamed asphalt mixture with 0.25kg of the second component water for 32s, after secondary foaming, crushing and screening into A material with a particle size of 0-9.5mm and B material with a particle size of 9.5-19mm;
[0062] Step 3: Stir and mix 60kg of material A, 40kg of material B, 35kg of gravel and 1.2kg of cement in proportion for 52s to obtain a foamed asphalt mixture.
PUM
Property | Measurement | Unit |
---|---|---|
particle diameter | aaaaa | aaaaa |
particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com