Novel assembly type aluminum alloy anti-seismic frame structure
An anti-seismic frame, aluminum alloy technology, applied in the direction of structural elements, anti-vibration, building components, etc., can solve the problems of small initial rotational stiffness, insufficient bearing capacity of aluminum alloy connection nodes, etc., to improve mechanical properties, solve the problem of electrochemical corrosion, The effect of increasing energy consumption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] Further, the combination sequence of embodiment 1 assembly position is divided into:
[0046] Step 1. In a pair of oppositely arranged stainless steel "T"-shaped connecting plates 2, the installation of the middle part of the web of each stainless steel "T"-shaped connecting plate 2, that is, the installation of areas A1 and A2, specifically, Connect the inner limb of a central stainless angle steel connector 42, the middle part of the channel beam web 31 of the aluminum alloy channel beam 3 on the corresponding side, the connecting plate web 21, and the groove of the aluminum alloy channel beam 3 on the other side The middle part of the shaped beam web 31 and the inner limb of another middle part stainless angle steel connector 42 are sequentially bonded and connected by ring groove rivets;
[0047] Step 2, connecting the channel beam backing plate 6 with the aluminum alloy channel beams 3 on both sides, that is, the installation of areas A3 and A4;
[0048] Step 3. I...
Embodiment 2
[0057] The combination sequence of embodiment 2 assembling positions is divided into:
[0058] Follow steps 1 to 4 to first install a pair of oppositely arranged stainless steel "T"-shaped connecting plates 2 below, that is, to install areas A1 to A10 according to the steps in Example 1;
[0059]Follow steps 1 to 4, and then install the upper pair of oppositely arranged stainless steel "T"-shaped connecting plates 2, that is, the installation of areas B1 and B2 according to step 1, and the installation of areas B3 and B4 according to step 2 , the installation of areas B5, B6, B7 and B8 is carried out in sequence according to step 3, and the installation of areas B9 and B10 is carried out according to step 4;
[0060] Finally, the combination of cross support 8 is carried out, and the combination sequence of cross support 8 is divided into:
[0061] Step 101, install two pairs of interrupted angular supports 83 successively, that is, install areas B21, B22, B23 and B24. Specif...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com