Shield-first and pipe-jacking-second up-and-down parallel overlapped tunnel structure and construction method thereof
A technology for shield tunneling and pipe jacking, applied in tunnels, tunnel linings, underground chambers, etc., can solve problems such as uneven deformation of pipe jacking channels, water leakage, and floating of shield tunnels, and achieve significant economic benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0064] see Figure 1-5 As shown in the figure, a tunnel structure with shield tunneling followed by pipe jacking is located in the soil body on the side of the subway station 1 that has been constructed in advance. The two intersecting tunnels are the upper tube jacking channel and the lower shield tunnel 3 respectively, and the channel centerline of the upper tube jacking channel and the tunnel center line of the lower shield tunnel face up and down and are arranged in parallel in space. The specific requirements of this project are that the upper pipe-jacking channel and the lower shield tunnel need to be arranged facing each other, the construction sequence needs to be shield tunneling first and then pipe-jacking, and both tunnels are new tunnels, which need to be completed within the same construction period.
[0065] The upper pipe jacking passage includes a starting shaft 4, a receiving shaft 5 and a pipe jacking passage 6 connecting the two. The outer side of the starti...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com