Construction method of bagged sand drain of height-limited highway section
A construction method, bagged sand technology, applied in infrastructure engineering, soil protection, construction, etc., can solve problems such as high project cost and difficult construction, and achieve the effect of avoiding demolition
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0013] The height of the sand well machine tower is determined according to the conditions of the construction site. A working platform is installed on the tower. Each section of sand well pipe is 2 to 4m long. A sleeve is installed on the upper end of each section of pipe. A steel cylinder and a hook are set under the vibrating hammer. The steel cylinder under the vibrating hammer extends into the casing of the sand well pipe for immersion, and the hook of the vibrating hammer is used to lift the steel wire rope tied to the bottom section of the sand well pipe in sections. , Remove sand well pipe. Measurement and setting out → mechanical centering and positioning → counting from bottom to top and positioning of the first sand well pipe → lowering the vibrating hammer, inserting the pile under the hammer into the sleeve of the first sand well pipe → sinking the first sand well pipe by vibration To about 0.2m out of the ground → the vibrating hammer rises → the hook lifts the s...
Embodiment 2
[0016] The Guangzhou-Zhuhai West Line Expressway adopts the construction method of bagged sand wells in the height-limited road section of the present invention. The bagged sand wells are arranged in a plum blossom shape. The diameter of the bagged sand wells is 7cm, the length is 18m, and the specific spacing of the sand wells is 1.2m. The height limit object is a high-voltage line with a clearance of 10m. By applying the construction method of the present invention, the construction of the bagged sand well in the high-speed section of the Guangzhou-Zhuhai West Line can be completed quickly and effectively without removing the high-voltage line. At the same time, the acceptance has reached the expected effect.
Embodiment 3
[0018] Shanjie Expressway adopts the construction method of bagged sand wells in the height-limited road section of the present invention. The bagged sand wells are arranged in a plum blossom pattern. The diameter of the bagged sand wells is 7cm and the length is 15m. The object is a flyover bridge with a clearance of 8m. By applying the present invention, the construction of the bagged sand wells in the Shanjie Expressway section can be completed quickly and effectively without affecting the use of the flyover bridge. At the same time, the acceptance has reached the expected effect.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com