Construction method of bagged sand drain of height-limited highway section

A construction method, bagged sand technology, applied in infrastructure engineering, soil protection, construction, etc., can solve problems such as high project cost and difficult construction, and achieve the effect of avoiding demolition

Active Publication Date: 2011-09-07
CRCC HARBOR & CHANNEL ENG BUREAU GRP SURVEY & DESIGN INST
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The object of the present invention is to provide a construction method for bagged sand wells in the height-limited road section. The technical construction method is difficult to construct or needs to use other methods to deal with the problem of high project cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0013] The height of the sand well machine tower is determined according to the conditions of the construction site. A working platform is installed on the tower. Each section of sand well pipe is 2 to 4m long. A sleeve is installed on the upper end of each section of pipe. A steel cylinder and a hook are set under the vibrating hammer. The steel cylinder under the vibrating hammer extends into the casing of the sand well pipe for immersion, and the hook of the vibrating hammer is used to lift the steel wire rope tied to the bottom section of the sand well pipe in sections. , Remove sand well pipe. Measurement and setting out → mechanical centering and positioning → counting from bottom to top and positioning of the first sand well pipe → lowering the vibrating hammer, inserting the pile under the hammer into the sleeve of the first sand well pipe → sinking the first sand well pipe by vibration To about 0.2m out of the ground → the vibrating hammer rises → the hook lifts the s...

Embodiment 2

[0016] The Guangzhou-Zhuhai West Line Expressway adopts the construction method of bagged sand wells in the height-limited road section of the present invention. The bagged sand wells are arranged in a plum blossom shape. The diameter of the bagged sand wells is 7cm, the length is 18m, and the specific spacing of the sand wells is 1.2m. The height limit object is a high-voltage line with a clearance of 10m. By applying the construction method of the present invention, the construction of the bagged sand well in the high-speed section of the Guangzhou-Zhuhai West Line can be completed quickly and effectively without removing the high-voltage line. At the same time, the acceptance has reached the expected effect.

Embodiment 3

[0018] Shanjie Expressway adopts the construction method of bagged sand wells in the height-limited road section of the present invention. The bagged sand wells are arranged in a plum blossom pattern. The diameter of the bagged sand wells is 7cm and the length is 15m. The object is a flyover bridge with a clearance of 8m. By applying the present invention, the construction of the bagged sand wells in the Shanjie Expressway section can be completed quickly and effectively without affecting the use of the flyover bridge. At the same time, the acceptance has reached the expected effect.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a construction method of a bagged sand drain of a height-limited highway section. A regular sand drain pile engine is reformed and the construction by a sleeve barrel tube connection method is adopted. The technical process is as follows: measuring and putting samples, mechanically aligning and positioning, connecting tubes in sections; sinking to the design depth, putting a sand drain, lifting the tubes, discharging the tubes in sections and moving the pile engine. The construction method comprises the concrete steps: determining the height of a tower frame of the sand drain pile engine according to side conditions; installing a working platform on the tower frame; determining the length of each tube of the sand drain as 2-4 m; installing a sleeve barrel on the upper end of each tube; inserting the upper tube into the sleeve barrel of the lower tube; installing a tube shoe on the bottom sand drain tube; installing earring tied steel wire ropes on each sleeve barrel; installing a steel column and a hanging hook under a vibrating hammer; extending the steel column under the vibrating hammer into the sleeve barrel of the sand drain tube for sinking; putting a sand drain bag after drilling to the design depth in sections; lifting the steel wire rope tied on the bottom sand drain tube in sections by the hanging hook of the vibrating hammer and discharging the sand drain tube in sections. By adopting the construction method, the problem of the bagged sand drain of height-limited highway section construction is solved without influening the safety of nearby buildings.

Description

technical field [0001] The invention relates to a novel construction method of a bagged sand well, in particular to a construction method of a bagged sand well in a limited-height road section, and belongs to the technical field of foundation and foundation engineering construction. Background technique [0002] A large number of soft soil foundations are distributed in coastal areas. Due to the insufficient natural bearing capacity of soft soil foundations, it is necessary to strengthen the soft soil foundations. The bagged sand well method has the characteristics of low cost and is widely used. [0003] In recent years, due to the rapid development of infrastructure, in some projects that use bagged sand wells to treat soft soil foundations, the erection of sand well construction equipment often encounters high-voltage lines or other building facilities. In order to solve this problem, People usually consider removing the height limiter or changing to other soft ground tr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E02D3/10
Inventor 李翔蒙庆辉周杰南谭祥韶
Owner CRCC HARBOR & CHANNEL ENG BUREAU GRP SURVEY & DESIGN INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products