Deepwater pile foundation steel casing construction method suitable for bare rock geological conditions

A technology of geological conditions and construction methods, applied in the direction of foundation structure engineering, drilling equipment and methods, sheet pile walls, etc., can solve the problems of difficult construction of pile foundation steel casings, easy slurry leakage at the bottom of casings, slow progress, etc. , to achieve the effect of ensuring the quality of pile foundation construction, short construction period, and less investment in equipment

Inactive Publication Date: 2020-12-04
NO 1 ENG CO LTD OF CR11BG +1
View PDF5 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to solve the difficulties and slow progress of pile foundation steel casing construction under bare rock geological conditions, and the bottom opening of the casing is easy to leak grout or even collapse during the later pile foundation construction process, which causes relatively large quality hidden dangers to pile foundation construction; Provides a construction method suitable for deepwater pile foundation steel casings under bare rock geological conditions; this method has high installation accuracy, stable hole openings, and fast construction speed, which improves the construction quality of pile foundations under complex conditions, improves construction efficiency and ensures construction Safety

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Deepwater pile foundation steel casing construction method suitable for bare rock geological conditions
  • Deepwater pile foundation steel casing construction method suitable for bare rock geological conditions
  • Deepwater pile foundation steel casing construction method suitable for bare rock geological conditions

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] given in the present invention figure 1 , figure 2 , image 3 In the embodiment, the outer jacket casing 1 is a circular steel casing, and the wall thickness can be determined according to the construction conditions. Generally, it can be selected as a steel plate with a thickness of 16-25mm. Its function is to block the impact of water flow on the cone bit The drill bit plays the role of guiding and positioning.

[0022] The construction casing 2 is a steel circular casing, which is used as the casing structure for the construction of the main body of the pile foundation.

[0023] The size of the cone drill bit should match the construction casing, and the rotary drilling rig provides power for the cone drill bit to pressurize and rotate the drill bit, cutting the rock surface to form an annular groove, so that the construction casing can just fall into the annular groove bit inside.

[0024] The method of the present invention to bare rock deep-water pile foundat...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a deepwater pile foundation steel casing construction method suitable for bare rock geological conditions. The method comprises the steps that a construction trestle and a drilling platform are erected; a riverbed foundation is explored and flattened; an outer sleeve water blocking steel casing is lowered and positioned; a rotary drilling rig is matched with a cutter barreldrill bit to conduct grooving on bed rock; a construction casing is embedded into an annular groove position; yellow clay or underwater concrete is lowered through a guide pipe to fill a gap betweenthe construction casing and the bare rock groove position; the outer sleeve steel casing is pulled out; the outer sleeve steel casing and the equipment are moved to the next hole site, and casing construction of other hole sites is completed in a circulating mode in sequence. According to the construction method, pile foundation steel casing construction under the difficult construction conditionsof bare rock, deep water and the like can be rapidly completed, the pile foundation construction casing can accurately extend into the stable bed rock, the pile foundation construction quality is effectively guaranteed, the construction process is safe and reliable, the construction period is short, and economic benefits are good.

Description

technical field [0001] The invention relates to the field of bridge pile foundation engineering, in particular to a construction method for steel casings of deepwater pile foundations suitable for bare rock geological conditions. Background technique [0002] In the field of bridge pile foundation engineering, bridge structures are commonly used to span rivers and rivers. The construction of bridge pile foundations on rivers is common in various projects. According to different geological conditions and hydrological conditions, the difficulty of pile foundation construction in water The degree varies greatly, and it is even more difficult to accurately locate and implant the casing in bare rock geology under deep water conditions; because the river bed cover is shallow and the bedrock of the river bed is directly exposed, the steel casing of the pile foundation cannot be used for vibratory hammer or pile driving The machine is directly lowered into place. [0003] At presen...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D27/52E02D5/66E02D5/38E21B7/12E21B7/04E21B7/18
CPCE02D5/385E02D5/665E02D27/52E02D2250/0007E02D2250/0023E02D2250/0076E21B7/043E21B7/122E21B7/185
Inventor 汪正武王燎原彭浩杨尚宋磊柯军乔清波李兴勇
Owner NO 1 ENG CO LTD OF CR11BG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products