Tunnel ahead and station following underground excavation station duct piece dismantling construction method and duct piece dismantling tool adopted by same
A technology for segment dismantling and construction method, applied in tunnels, tunnel lining, shaft equipment and other directions, can solve the problems of non-reuse, large operation risk of segment removal construction method, segment damage, etc., so as to reduce the impact of shield tunneling process. , Avoid the risk of dismantling the segment, and the effect of non-destructive dismantling
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Embodiment 1: A construction method for dismantling station segments in underground excavation of tunnels first, see Figure 1-3 , including the following steps:
[0034] (1) Full ring grouting of segment 1 at interface position
[0035] In order to prevent the back of the segment 1 at the interface from being filled tightly and to prevent mud and water gushing during dismantling, a double-liquid grouting machine is specially used to make closed rings for 3 consecutive rings at the segment 1 at the interface between the station and the shield section, and inject double grout. In order to prevent abnormalities when the segments are removed. The cement slurry ratio is cement slurry: water glass = 1:1, the grouting sequence is from bottom to top, staggered hole grouting, and the grouting pressure and grouting amount are strictly controlled during the grouting process to prevent segment misalignment, damaged.
[0036] (2) Segment 1 bracket reinforcement at the interface...
Embodiment 2
[0041] Embodiment 2: A construction method for dismantling station segments by excavating tunnels first and then excavating stations, see Figure 5 , and the difference from Example 1 is that: in the segment removal step, a Φ80mm hole is reserved at the corresponding position below the middle plate during construction, and the reserved hole 4 can also be used as a feeding hole for the later rail top air duct construction. Use the reserved hole 4 to install the hook, and use the reverse chain to remove the segments one by one. When the segments are removed, they are supported by temporary supports in the tunnel.
Embodiment 3
[0042] Embodiment 3: A kind of tooling for dismantling the segment of the tunnel excavated first and then the station, see Figure 6 , including installation machine 9 and front trailer frame 10. The installation machine 9 is provided with a hydraulic pump station, which controls the installation machine to walk and rotate 360 degrees around. The invention is to remove the segment mechanically, and the remote control device of the segment installation machine can be used to realize the remote removal of the segment, avoiding the risk of man-made removal of the segment.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com