[0082] Such as figure 1 The shown construction method for primary support invasion and arch replacement of a large-section loess tunnel includes the following steps:
[0083] Step 1. Radial grouting reinforcement of the arch wall: Radial grouting reinforcement is carried out along the longitudinal extension direction of the tunnel from back to front for the arch replacement section in the loess tunnel being constructed, and the arch replacement section is obtained The radial reinforcement structure;
[0084] The section that needs to be replaced is formed by connecting a restricted section and two extension sections that are respectively located on the front and rear sides of the section that needs to be replaced. The initial support structure of the section that needs to be replaced is a reinforced primary support structure; The section is the tunnel section where the reinforced primary support structure is deformed and invaded in the constructed loess tunnel, and the two ex...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com