High-performance permeable concrete system prepared by construction wastes and preparation method thereof

A technology for permeable concrete and construction waste, which is applied to the coagulation pavement, buildings, roads and other directions of on-site paving, and can solve the problems of polluting the environment, low construction efficiency, and short service life.

Inactive Publication Date: 2019-05-07
IANGSU COLLEGE OF ENG & TECH
View PDF18 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

With the rapid development of our country, earth-shaking new changes have taken place in most cities, especially in the construction industry. There are many high-rise buildings in various cities and are prosperous. However, a large amount of construction waste is produced in the process of urban upgrading and transformation. It takes up a lot of space and pollutes the environment, so it is necessary to recycle construction waste
[0003] In the prior art, construction waste will be made into a permeable concrete system. However, the existing permeable concrete system prepared from construction waste has poor compressive strength, tensile strength, elongation at break, and impact strength, and cannot meet the requirements of << Permeable Cement Concrete Pavement Technical Regulations (CJJ / T 135-2009) stipulates the standard requirements for the permeable concrete grades C20 and C30. Secondly, its permeable performance and safety performance are poor, especially in rainy weather. In the upper part, a large amount of rainwater will accumulate on the upper surface, which will reduce the static friction coefficient of the upper surface, which will lead to a decrease in the static friction force between pedestrians or vehicles and the upper surface, which will easily cause pedestrians to slip and vehicles to slip, and more importantly The most important thing is that the braking distance of the vehicle cannot be effectively guaranteed, resulting in a significant increase in the frequency of traffic accidents. In addition, its service life is short, and its surface is often cracked due to geological subsidence changes or thermal expansion and contraction. In addition, the current Some methods of preparing permeable concrete system prepared from construction waste have unscientific and unreasonable construction steps, long construction period, low construction efficiency, and poor construction quality. Therefore, a high-performance permeable concrete system prepared from construction waste and its preparation are proposed. method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High-performance permeable concrete system prepared by construction wastes and preparation method thereof
  • High-performance permeable concrete system prepared by construction wastes and preparation method thereof
  • High-performance permeable concrete system prepared by construction wastes and preparation method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0051] A high-performance permeable concrete system prepared from construction waste, such as Figure 1-4 As shown, it includes a foundation pit 10 excavated on the ground 1. The interior of the foundation pit 10 is centered with a roadbed 2, and the inside of the foundation pit 10 is located on the top of the roadbed 2. A stable base layer 3 and The concrete layer 4 and the high-performance water-permeable surface layer 5 have gaps reserved between the inner walls on both sides of the foundation pit 10 and the edge of the roadbed 2, and a flow guide unit 7 is arranged inside the gap.

[0052] By adopting the above-mentioned technical scheme, the system is made of subgrade 2, stable base 3, concrete layer 4 and high-performance permeable surface layer 5, which can not only ensure its bearing strength, but also make it have high permeable performance, especially in rainy weather When the rainwater drops on the upper part of the high-performance water-permeable surface layer 5, ...

Embodiment 2

[0081] The difference from Example 1 is that the preparation method of the high-performance permeable concrete system prepared by construction waste comprises the following steps:

[0082] S1. Excavating the foundation pit 10 on the ground using an excavator. After the foundation pit 10 is dug, the inner wall of the foundation pit 10 is manually corrected to ensure that the inner wall of the foundation pit 10 is smooth;

[0083] S2, lay subgrade 2, lay one deck 4cm thick natural soil layer in the middle of the top of foundation pit 10, formwork is installed at the edge of natural soil layer simultaneously, the edge of natural soil layer is finalized, guarantee template and foundation pit 10 simultaneously Reserve a gap between the two inner walls, and then sprinkle water evenly on the upper part of the natural soil layer until the natural soil layer is completely wet, then lay a layer of 1cm thick lime layer on the upper part of the natural soil layer, and then pour water on th...

Embodiment 3

[0093] The difference from Example 1 is that the preparation method of the high-performance permeable concrete system prepared by construction waste comprises the following steps:

[0094] S1. Excavating the foundation pit 10 on the ground using an excavator. After the foundation pit 10 is dug, the inner wall of the foundation pit 10 is manually corrected to ensure that the inner wall of the foundation pit 10 is smooth;

[0095] S2, lay subgrade 2, lay one deck 4cm thick natural soil layer in the middle of the top of foundation pit 10, formwork is installed at the edge of natural soil layer simultaneously, the edge of natural soil layer is finalized, guarantee template and foundation pit 10 simultaneously Reserve a gap between the two inner walls, and then sprinkle water evenly on the upper part of the natural soil layer until the natural soil layer is completely wet, then lay a layer of 1cm thick lime layer on the upper part of the natural soil layer, and then pour water on th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Granularityaaaaaaaaaa
Granularityaaaaaaaaaa
Granularityaaaaaaaaaa
Login to View More

Abstract

The invention discloses a high-performance permeable concrete system prepared by construction wastes and a preparation method thereof. The high-performance permeable concrete system prepared by the construction wastes comprises a foundation pit excavated in the ground; a roadbed is laid in the middle in the foundation pit; a stable base course, a concrete course and a high-performance permeable surface course are laid at the upper part of the roadbed in the foundation pit in sequence; clearances are reserved between the internal walls of the two sides of the foundation pit and the edge of theroadbed; and flow guide units are arranged in the clearances. According to the high-performance permeable concrete system prepared by the construction wastes, the bearing strength, the tensile strength, the elongation at break and the impact strength are better; high water permeability and higher safety performance are realized; slipping of pedestrians and sideslip of a vehicle can be effectivelyprevented; the frequency of occurrence of traffic accidents can be greatly reduced; the service life is long; a cracking phenomenon of the high-performance permeable surface course caused by a factorof geological subsidence variation or cold shrinkage and thermal expansion can be effectively prevented; and the provided preparation method has the advantages of scientific and reasonable construction steps, short construction period, high construction efficiency and good construction quality.

Description

technical field [0001] The invention relates to the technical field of construction, more specifically, it relates to a high-performance permeable concrete system prepared from construction waste and a preparation method thereof. Background technique [0002] Construction waste refers to the dregs, spoils, waste materials, silt and other wastes generated during the construction, laying or demolition, and repair of various buildings, structures, and pipe networks by construction units or individuals. With the rapid development of our country, earth-shaking new changes have taken place in most cities, especially in the construction industry. There are many high-rise buildings in various cities and are prosperous. However, a large amount of construction waste is produced in the process of urban upgrading and transformation. It takes up a lot of space and pollutes the environment, so it is necessary to recycle construction waste. [0003] In the prior art, construction waste wi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01C11/22E01C3/04E01C7/32E01C21/00E01C7/14C04B28/10C04B28/02
Inventor 王斯海高路恒王宇季克亮
Owner IANGSU COLLEGE OF ENG & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products