Batched variable-region junction and application thereof
A batch and quantitative change technology, applied in the transportation field, can solve problems such as blocked exit lanes, multi-cycle time, and low traffic capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0110] like figure 2 As shown, it is a batch variable area entrance and exit. Outside the exit lane 13, that is, opposite to the exit lane 13 of the left-turn waiting area 1, a reverse traffic zone 2 is set up, and the reverse traffic zone 2 is ahead of the left-turn waiting zone 1 by a longitudinal distance.
[0111] The central isolation between the left-turn waiting area 1 and the exit, and the isolation zone 16 between the exit lane 13 and the reverse traffic area 2 are all indicated by dashed lines.
[0112] Set stop line 8 on the exit lane 13 between the front part of the left-turn waiting area 1 and the front part of the retrograde area 2, and corresponding exit lights, the exit lights are common traffic lights.
[0113] Retrograde zone 2 is equipped with light poles, with curved long arms on the light poles. The long arms extend into the sky above the exit, and row lights are installed on the long arms, so that the row lights are above the exit.
[0114] A row of la...
Embodiment 2
[0123] A batch variable area entrance and exit, the others are the same as those in Embodiment 1, the difference is that:
[0124] There is only one lane in left turn waiting area 1 and reverse traffic area 2 respectively.
[0125] The signal lights 25 all illuminate the left-turn waiting area 1 obliquely backward, and the angle β formed by the boundary lines of the light range is 22 degrees. The direction of the beam centerlines of each signal lamp 25 is parallel, and the angle γ between the beam centerline and the longitudinal direction of the entrance and exit is 45 degrees, and each lamp faces the left-turn waiting area 1 .
[0126] t1 is the first second, the green duration c1 of each light in the row of lights is 3 seconds, the exit light turns green time t2 is the 6th second, and the speed v is 15m / s.
[0127] The vehicle travels from the left-turn waiting area 1 to the left front and enters the reverse traffic area 2. During this process, it travels an average of 25 m...
Embodiment 3
[0133] The entrance and exit of the batch variable area are applied to the left turntable. The left turntable is single-phase controlled, and the cycle is 36 seconds. The red duration of the exit lights of each entrance and exit is 6 seconds, which accounts for 16.7% of the period.
[0134] Batch variable zone entrances and exits are applied to intersections, which are controlled by two phases, and the cycle is 70 seconds. The red duration of the exit lights of each entrance and exit is 8 seconds, which accounts for 11.4% of the period.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com