An Excavation Construction Method Applicable to Large-Section Tunnels in Fractured Zones of Rich Water Faults
A construction method and broken zone technology, applied in tunnels, tunnel linings, drainage, etc., can solve problems such as tunnel collapse
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] In order to make the technical problems, technical solutions and advantages to be solved by the present invention clearer, the following will describe in detail with reference to the drawings and specific embodiments.
[0030] The invention provides an excavation construction method suitable for a large-section tunnel in a water-rich fault fracture zone.
[0031] Such as figure 1 As shown, the method includes the following steps:
[0032] (1) Excavation I of the upper half section of the pilot tunnel on the right, and implement initial support 1 and temporary support 1a;
[0033] (2) Excavation II of the lower half section of the right pilot tunnel, construction of initial support 2 and temporary support 2a, construction of mortar bolts for the right pilot tunnel, base grouting small conduit and main tunnel I-beam 1b, pouring concrete 1c;
[0034] (3) Excavate III on the upper half of the left pilot tunnel, and implement initial support 3 and temporary support 3a;
...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com