Immersed pipe construction method of floating box type water floating gantry crane method
A construction method, the technology of the door hanging method, is applied in the directions of pipeline laying and maintenance, pipes/pipe joints/pipes, mechanical equipment, etc. The construction principle is simple and easy to implement, the number of occupations is reduced, and the repair operation is simple.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0056] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0057] The detailed steps of the immersed tube construction method of the floating box type water floating gantry crane method are as follows:
[0058] Preparation:
[0059] First set up an on-shore processing site near the construction of the pipeline crossing the waterway, and carry out the welding and lengthening of the standard pipe section and the transition section of the pipeline to form a steel pipe for the long unit section to be connected.
[0060] According to the length of the integral steel pipe 1, steel pipe piles 17 are applied on the waterway as anchor points for fixing the controllable buoyancy tank 3, and are used to fix the steel pipes on the water surface during water operations to prevent them from drifting with the current.
[0061] A trench for filling the steel pipes is excavated in advance on the river bed.
[0062] S...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com