Manufacturing method of 23CrNi3Mo alloy steel seamless pipe for drilling tool
A manufacturing method and technology of alloy steel, applied in the field of alloy steel, can solve the problems of poor surface quality, high equipment requirements, low product dimensional accuracy, etc., and achieve the effects of good surface quality, high dimensional accuracy and strong practicability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0056] The present embodiment provides a kind of manufacturing method of 23CrNi3Mo alloy steel seamless pipe for drilling tools, comprising the following steps:
[0057] (1) Peeling and cutting off the round steel;
[0058] (2) The tube blank obtained in step (1) is pierced with a hot piercer, and the obtained tube blank is pierced with a Φ60mm hot piercer, and the capillary specification after piercing is Φ80×17mm;
[0059] (3) Pickling the capillary obtained in the preceding step (2) to remove scale, the pickling temperature is 45°C, and the pickling time is 90 minutes;
[0060] (4) Spheroidizing the steel pipe after pickling obtained in step (3), the heat treatment temperature is 680°C, the holding time is 4h, and then cooled at 15°C / h to ≤450°C, and then air-cooled;
[0061] (5) The heat-treated steel pipe obtained in step (4) is pickled again to remove surface scale. The pickling temperature is 45°C and the pickling time is 90 minutes. The pickling uses sulfuric acid wit...
Embodiment 2
[0068] The present embodiment provides a kind of manufacturing method of 23CrNi3Mo alloy steel seamless pipe for drilling tools, comprising the following steps:
[0069] (1) Peeling and cutting off the round steel;
[0070] (2) The tube blank obtained in step (1) is pierced with a hot piercer, and the obtained tube blank is pierced with a Φ60mm hot piercer, and the capillary specification after piercing is Φ80×17mm;
[0071] (3) Pickling the capillary obtained in the preceding step (2) to remove scale, the pickling temperature is 70°C, and the pickling time is 150 minutes;
[0072] (4) Spheroidizing the steel pipe after pickling obtained in step (3), the heat treatment temperature is 690°C, the holding time is 6h, and then cooled at 30°C / h to ≤450°C and then air-cooled;
[0073] (5) The heat-treated steel pipe obtained in step (4) is pickled again to remove surface scale. The pickling temperature is 70°C, and the pickling time is 150 minutes. The pickling uses sulfuric acid w...
Embodiment 3
[0080] The present embodiment provides a kind of manufacturing method of 23CrNi3Mo alloy steel seamless pipe for drilling tools, comprising the following steps:
[0081] (1) Peeling and cutting off the round steel;
[0082] (2) The tube blank obtained in step (1) is pierced with a hot piercer, and the obtained tube blank is pierced with a Φ60mm hot piercer, and the capillary specification after piercing is Φ80×17mm;
[0083] (3) Pickling the capillary obtained in the preceding step (2) to remove scale, the pickling temperature is 55°C, and the pickling time is 130 minutes;
[0084] (4) Spheroidizing the steel pipe after pickling obtained in step (3), the heat treatment temperature is 685°C, the holding time is 5h, and then cooled at 20°C / h to ≤450°C, and then air-cooled;
[0085] (5) The heat-treated steel pipe obtained in step (4) is pickled again to remove surface scale. The pickling temperature is 60°C, and the pickling time is 120 minutes. Sulfuric acid with a mass concen...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com