A kind of construction method of spherical warehouse
A construction method and spherical technology, applied in the direction of arched structure, dome roof structure, building components, etc., can solve the problems of destroying the polyurethane layer, the integrity of the concrete layer, wasting materials, etc., to achieve material saving, long service life, overall Uniform force effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0032] The construction method of a spherical warehouse provided in this embodiment includes the step of constructing the annular foundation, the step of laying the membrane body and the step of spraying a polyurethane layer in the membrane body, and between the step of constructing the annular foundation and the step of laying the membrane body Also include the following steps:
[0033] Measure the position of the reserved hole according to the already designed construction data and mark it on the ground of the ring foundation;
[0034] After the step of laying the membrane body, projecting the position of the reserved hole marked on the ground of the annular foundation onto the membrane body and marking on the membrane body;
[0035] During the step of spraying the polyurethane layer inside the membrane, a mold with pre-reserved holes is placed on the mark and the polyurethane layer is sprayed.
[0036] In the above-mentioned embodiment, the reserved hole mold is placed on ...
Embodiment 2
[0038] A kind of spherical warehouse construction method provided in this embodiment includes:
[0039] The ring foundation construction step, the membrane body laying step and the step of spraying polyurethane layer in the membrane body, also include the following steps between the ring foundation construction step and the membrane body laying step:
[0040] (i) Measure the center of the spherical warehouse and mark it on the ground of the circular foundation;
[0041] (ii) mark the vertical and horizontal axes on said ground according to the center of the circle;
[0042] (iii) divide the circular control line equally on the ground of the circular foundation according to the vertical and horizontal axes;
[0043] (a) Measure the position of the reserved hole according to the designed construction data and mark it on the ground of the circular foundation;
[0044] After the step of laying the membrane body, projecting the position of the reserved hole marked on the ground o...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com