Reinforced concrete chimney big steel mould integral lifting construction method
A reinforced concrete, integral lifting technology, applied in the field of chimneys, can solve the problems of long construction period and complicated lifting facilities, and achieve the effect of simplifying the lifting system
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0021] A construction method for overall lifting of a large steel formwork for a reinforced concrete chimney, comprising:
[0022] 1. According to the alignment and positioning of the cylinder structure, set up a full scaffolding on the bottom plate of the chimney foundation.
[0023] 2. The position of the construction layer in the full hall frame is covered with wooden springboards as a simple operation platform. The operation platform is divided into two layers. Security protection reinforcement layer. A square hole of 0.9m x 0.9m is reserved in the middle of the operation platform as the loading and unloading channel for the hanging basket or bucket.
[0024] 3. Install vertical transportation facilities: The vertical lifting equipment in the chimney adopts a 3t hoist, equipped with a 16mm diameter steel wire rope, and the material is loaded and unloaded through the inner bucket or hanging basket. Steel bars are transported vertically by pull rods on the derrick.
[002...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com