Composite geomembrane anti-seepage structure capable of automatically adapting to weir body deformation and construction method
A composite geomembrane and self-adaptive technology, which is applied in similar engineering fields, can solve problems such as expansion joints that are difficult to deploy and lose their proper functions, so as to reduce strain concentration, reduce tensile or shear damage, and reduce the degree of damage Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Embodiment one: if figure 1 , figure 2 As shown, the concrete structure in this example is a concrete plinth 1, one side of the plinth is the shore bedrock 15, and the other side is connected with the cushion layer 5, and the bottom plate of the concrete plinth 1 and the shore bedrock are connected by anchor bars 4 is connected with the consolidation grout 2 and the grouting curtain 3 is set along the axis of the concrete plinth 1; The inner end of the upper protective layer PE film 10 and the subsequent part of the lower protective layer PE film 6 are respectively covered on the U-shaped expansion joint 7 and the auxiliary horizontal expansion joint by painting asphalt with a thickness of 0.2mm and the surface of the concrete toe slab 1. 9 upper and lower surfaces.
[0034] The construction method of embodiment one is as follows:
[0035] a. Concrete plinth 1 and anti-seepage system setting: one side of the concrete plinth 1 is the shore bedrock 15, which provides ...
Embodiment 2
[0042] Embodiment two: if figure 2 , image 3 As shown, the concrete structure of this example is an anti-seepage wall 12, and the top of the anti-seepage wall is a concrete cap 13 and a guide wall 14; The inner end of the lower protective layer PE film 6 is bonded to the surface of the concrete cap 13 by painting asphalt with a thickness of 0.2mm, and the subsequent parts of the upper protective layer PE film 10 and the lower protective layer PE film 6 are respectively covered on the U-shaped expansion joint 7 and The upper surface and the lower surface of the auxiliary horizontal expansion joint 9.
[0043] The construction method of embodiment two is as follows:
[0044] a. Concrete anti-seepage wall 12 and anti-seepage system setting: the upper end of the concrete anti-seepage wall 12 is a concrete cap 13 and a guide wall 14, and the two sides of the concrete cap 13 are connected to the cushion layer 5;
[0045] b. Setting of cushion layer 5: below the cushion layer 5 ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com