Ecological dredging handling method for riverways or lakes
An ecological dredging and treatment method technology, applied in the field of river and lake pollution control, can solve the problem of ecological niche restoration without consideration of engineering, environment, sustainable development of ecological river and lake water, high construction intensity and labor intensity of workers, and a large number of machinery. equipment and other problems, to achieve the effect of curbing the degradation of river stability, improving water ecological cycle, and restoring ecological environment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] An ecological dredging treatment method for river courses or lakes, including the treatment of sediment, riverbed and embankment banks, specifically comprising the following steps:
[0047] (1) Use a temporary dam to divide the river into multiple cofferdams, dig out the sediment in the cofferdam, add modifiers to the sediment to modify it, remove heavy metal ions in the sediment, and then transport it to the sediment for storage The drying field is reused after drying treatment; the surrounding of the sediment storage drying field is provided with an enclosure, the inner wall of the enclosure is provided with an anti-seepage geomembrane, and the bottom sludge storage drying field is from the bottom to the top A blind ditch anti-seepage layer, a blind ditch, a mud bed cushion, a mud bed filter layer, and a sediment storage layer for stacking sediment are arranged in sequence, and a leachate collection pipe is arranged in the blind ditch;
[0048] (2) A support layer, a ...
Embodiment 2
[0057] Use the ecological dredging treatment method of a river course or lake of the present invention to control the river course of a certain city in the south. Among the water quality evaluation indicators before treatment, CODcr, ammonia nitrogen, total nitrogen and total phosphorus are inferior to category V in all sections, which belong to a typical "black and smelly" river. After treatment, the black and smelly river has been eliminated, and the river water body is transparent in summer It is generally increased to 400mm, and reaches 600mm in winter, and the water quality meets the "Water Quality Standards for Sewage Recycling and Landscape Environment Water" (GB / T18921-2002).
PUM
Property | Measurement | Unit |
---|---|---|
Width | aaaaa | aaaaa |
Aperture | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com