Production method of high-strength alloy r320cr rail
A production method and alloy technology, applied in the field of metallurgy, can solve the problems of high crack sensitivity, difficult process control, and low Cr yield, so as to improve fatigue resistance, ensure production rhythm, and reduce alloy burning loss. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] A production method of high-strength alloy R320Cr steel rail, comprising the following steps:
[0022] 1) Desulfurization of molten iron: reducing the sulfur content in molten iron to 0.001%;
[0023] 2) Converter smelting: Control the C content of the tapping to 0.013%, and the tapping temperature to 1660°C. During the tapping process, Si and Mn alloys are added first, and Cr iron is added later, and slag is added to modify the slag at the same time. Raw materials, Al content in auxiliary materials;
[0024] 3) Refining in LF furnace: Strictly control the basicity of slag during LF refining to 2.1, and the heating time is 43 minutes;
[0025] 4) RH refining: strictly control the RH vacuum refining time within 15 minutes;
[0026] 5) Soft blowing: After RH refining, perform soft blowing for 10 minutes, and control the argon flow during soft blowing to ensure that the slag surface does not roll;
[0027] 6) Bloom continuous casting: continuous casting process protecti...
Embodiment 2
[0031] 1) Desulfurization of molten iron: reducing the sulfur content in molten iron to 0.0015%;
[0032] 2) Converter smelting: control the C content of the tapping to 0.018%, and the tapping temperature to 1646°C. During the tapping process, Si and Mn alloys are added first, and Cr iron is added later, and slag is added to modify the slag at the same time. Raw materials, Al content in auxiliary materials;
[0033] 3) LF furnace refining: Strictly control the basicity of slag during LF refining to 1.9; the heating time is 48 minutes;
[0034] 4) RH refining: strictly control the RH vacuum refining time within 15 minutes;
[0035] 5) Soft blowing: soft blowing for 8 minutes after RH refining;
[0036] 6) Bloom continuous casting: continuous casting process protection casting, using low-alumina mold slag, and adopting constant casting speed operation, the casting speed is 0.65m / s, to ensure the ability of the tundish and mold to further remove inclusions, while the secondary ...
Embodiment 3
[0040] A production method of high-strength alloy R320Cr steel rail, comprising the following steps:
[0041]1) Desulfurization of molten iron: reducing the sulfur content in molten iron to 0.0005%;
[0042] 2) Converter smelting: control the C content of the tapping to 0.01%, and the tapping temperature to 1670°C. During the tapping process, Si and Mn alloys are added first, Cr iron is added later, and slag is added to modify the slag at the same time. Raw materials, Al content in auxiliary materials;
[0043] 3) Refining in LF furnace: Strictly control the basicity of slag during LF refining to 2.2, and the heating time is 40 minutes;
[0044] 4) RH refining: strictly control the RH vacuum refining time at 16 minutes;
[0045] 5) Soft blowing: soft blowing for 5 minutes after RH refining;
[0046] 6) Bloom continuous casting: continuous casting process protection casting, using low-aluminum mold slag, and adopting constant casting speed operation, the casting speed is 0.7...
PUM
Property | Measurement | Unit |
---|---|---|
tensile strength | aaaaa | aaaaa |
hardness | aaaaa | aaaaa |
tensile strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com