Blast furnace smelting method by using vanadium-titanium two-phase sintering ore
A blast furnace smelting and sintering technology, applied in the field of iron and steel metallurgy, can solve the problems of unsatisfactory technical and economic indicators, increased consumption of iron ore per ton, insufficient sintered ore output, etc., and is beneficial to the stable and smooth operation of the blast furnace and reduces the cost of ironmaking. , the effect of increasing the ratio
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0036] Example 1 Preparation of vanadium-titanium two-phase sinter
[0037] The sinter raw material contains the following mass ratio components: 50-75% of vanadium-titanium magnetite concentrate, 5-30% of ordinary iron lump ore, 8-15% of flux, and 3-5% of fuel; -45%; Among them, the composition of vanadium-titanium magnetite concentrate is TFe40-60%, TiO 2 Content 0-15%; TFe 47-52% in the sintered ore, ternary basicity ((CaO+MgO) / SiO 2 ) at 2.0-3.5 times, MgO content 2.0-4.0%, TiO 2 content of 6.0-9.0%; the low-basicity phase (CaO / SiO22 >2 times) accounts for 50-80% of the sintered mineral material (deducting return ore);
[0038] Preparation of sintered ore: 50-75% of the above-mentioned vanadium-titanium magnetite concentrate, 5-30% of ordinary iron ore, 8-15% of flux, and 3-5% of fuel; in addition, the above-mentioned Materials (new materials) are also added with returned ore and recycled materials in the factory. The quality of returned ore accounts for 20-45% of the t...
Embodiment 2
[0040] Example 2 Preparation of vanadium-titanium pellets
[0041] The material structure is 97-99% vanadium-titanium concentrate, 1-3% bentonite, 49-56% TFe in vanadium-titanium pellets, TiO 2 The content is 6.0-11.0%; the particle size of the pellets is 8-20mm; the vanadium-titanium pellets are prepared by adopting the production process of the chain grate rotary kiln.
Embodiment 3
[0042] Example 3 The method of blast furnace smelting using vanadium-titanium two-phase sinter
[0043] Blast furnace charge structure: 100% of the vanadium-titanium two-phase sintered ore prepared in Example 1 is added to the blast furnace in batches with fuel from the top of the blast furnace; the grade of TFe integrated into the blast furnace is 45-52%;
[0044] Charging system: adopt equal material line for ore and coke, material line 1.2-2.2 meters, batch weight of ore 16-48t, coke load 2.5-5.5t / t, ore platform 1-9 rings, coke platform 2-9 rings, coke The outer ring is 0.5-3° larger than the ore outer ring, the coke middle ring is equiangular with the ore inner ring, the ore outer ring is 0-10° larger than the inner ring, and the coke inner ring is 1-10° smaller than the ore inner ring;
[0045] Hearth heat system: control [Ti] in pig iron between 0.10-0.40%, [Si] between 0.10-0.30%, [Si]+[Ti] between 0.20-0.7%;
[0046] Slagging system: MgO content in blast furnace slag...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com