Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Interference distributing method, interference distributing system, database and reconfiguration management node

An allocation method and node management technology, applied in the field of cognitive radio, can solve problems such as flexible power control of unsuitable secondary systems, impact on system stability, uncontrollable delay, etc.

Inactive Publication Date: 2014-11-12
ZTE CORP
View PDF5 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] 1. It is not suitable for flexible power control between devices in the secondary system; specifically, the database is used as a global management node to manage all secondary user devices, and the increase of each secondary user device on each TVWS spectrum resource will trigger the database to perform TVWS The allocation of spectrum resources, and even the readjustment of the transmission parameters of devices in multiple secondary systems, will affect the stability of the system;
[0006] 2. The delay is uncontrollable; specifically, the database is an entity operated by the main system operator or a third party, and its processing delay is not controlled by the secondary system, so the entire reconfiguration process is difficult to meet the secondary system business continuity requirements

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Interference distributing method, interference distributing system, database and reconfiguration management node
  • Interference distributing method, interference distributing system, database and reconfiguration management node
  • Interference distributing method, interference distributing system, database and reconfiguration management node

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0138] When there is no working secondary system on the target TVWS spectrum, the secondary system reconfiguration management node allocates the power determination scheme of the TVWS spectrum resource to a base station under it. In the scheme, the CCP is used as the reconfiguration management node for description. Detailed process such as Figure 4 As shown, it is described in detail below:

[0139] Step 401: base station BS 1 Initiate a TVWS spectrum resource application to the secondary system central control node (CCP);

[0140] Concrete, BS 1 Send its own location information, and related capabilities or resource requirements information, such as: supported operating frequency range of 470-560MHz, bandwidth of 5MHz, expected transmission power of 30dBm, etc., to the CCP.

[0141] Step 402: CCP sends TVWS spectrum resource request information to the database;

[0142] Step 403: The database feeds back the free spectrum resource information and the maximum interference v...

Embodiment 2

[0148] When there is a working secondary system on the target TVWS spectrum, the secondary system reconfiguration management node allocates the transmit power scheme of the spectrum to the subordinate base stations. In this embodiment, the secondary system reconfiguration management node initiates a resource request to the database together after a period of time for subordinate base station resource applications. The detailed process is as follows: Figure 5 As shown, it is described in detail below:

[0149] Step 501: base station BS 1 、BS 2 successively to the central control node CCP of the secondary system where it is located 1 Initiate TVWS spectrum resource application;

[0150] Specifically, each base station reports relevant information separately, so that the CCP 1 Appropriate resources can be allocated. BS 1 Put your own location information, and related capabilities or resource requirements information, such as: BS 1 The supported operating frequency range i...

Embodiment 3

[0161] When multiple secondary systems use the same TVWS spectrum resources at the same time, the database allocates the allowable interference value for the multiple secondary systems based on the secondary system attributes. The signaling process is as follows: Figure 6 As shown, it is described in detail below:

[0162] Step 601: base station BS 1 、BS 2 and BS 3 Reconfigure the management node CCP to the secondary system to which it belongs 1 、CCP 2 Send a spectrum resource request;

[0163] Specifically, each base station reports relevant information respectively, so that the CCP can allocate appropriate resources. BS 1 、BS 2 belongs to CCP 1 : BS 1 、BS 2 Send their respective location information, and related capabilities or resource requirements information, such as: supported operating frequency range of 470-560MHz, bandwidth of 5MHz, expected transmission power of 40dBm, etc. to the CCP 2 ;BS 3 Send your own location information, related capabilities or re...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

Disclosed is a method for interference distribution. The method comprises: a reconfiguration management node of a secondary system acquires or receives information of an idle spectrum resource and information on the total interference value that the secondary system is permitted to generate on the idle spectrum resource; and, the reconfiguration management node calculates, on the basis of the information on the total interference value that the secondary system is permitted to generate, a transmission power for a secondary user equipment that is subordinate to the reconfiguration management node. While at the same time, also disclosed are a system, management node, database, and storage medium for interference distribution.

Description

technical field [0001] The present invention relates to cognitive radio technology in the field of wireless communication, in particular to a secondary system-based interference allocation method, system, database and reconfiguration management node. Background technique [0002] With the continuous advancement of radio technology, a large number of various radio services have emerged, but the spectrum resources that radio services rely on are limited. Faced with the continuous increase in people's demand for bandwidth, spectrum resources are extremely tense. However, in the traditional fixed spectrum allocation mode, the utilization rate of spectrum resources is not high. In a sense, it is this spectrum allocation system that is fixedly allocated to the licensed system that has caused the extremely tight situation of spectrum resources. The cognitive radio technology breaks the fixed spectrum allocation system in the traditional sense, and dynamically allocates the spectrum...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H04W52/04H04W72/04H04W16/14H04W4/24
CPCH04W52/244H04W52/38H04W52/243H04L27/0006H04W4/24H04W16/14
Inventor 刘星李岩王斌苗婷
Owner ZTE CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products