A shale gas well, CO2 technology, applied in the direction of wellbore/well components, production fluid, earthwork drilling, etc., can solve the problems of large water consumption, environmental hazards, clay mineral expansion, dispersion migration, etc., to reduce environmental pollution Pollution degree, short production cycle, good practical effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Shale gas well liquid CO 2 Fracturing process, it needs to be equipped with fracturing pump truck, closed sand mixing truck, CO 2 Booster pump truck, instrument truck, fracturing manifold truck, CO 2 Tanker and CO 2 For storage tanks, the fracturing manifold truck is equipped with low-pressure manifolds and high-pressure manifolds, and the instrument truck is equipped with monitoring instruments, which is characterized in that: the method is carried out according to the following steps:
[0035] Step 1, put some CO 2 Tanker and CO 2 Storage tanks are connected in parallel, and then sequentially connected with CO 2 The booster pump truck, the closed sand mixer truck, and the fracturing pump truck are connected, the fracturing pump truck is connected to the discharge pipeline at the wellhead, and the instrument truck is connected to the above-mentioned vehicles to monitor the working status; all vehicles pass through the fracturing manifold The low-pressure manifold ...
Embodiment 2
[0044] Taking Well X of Yanye as an example, the target interval is 1136 to 1201 meters deep, and the interval is the black shale of the Chang 7 member. The mud logging gas logging shows obvious, and there is no productivity after perforation.
[0045] The well uses liquid CO 2 No sand is used for fracturing, and the fracturing string is a 5.5-inch casing of J55 steel grade.
[0046]Before fracturing, mix 3.0 to 10.0% HCl, 0.5% drainage aid, 0.3% corrosion inhibitor, 0.2% iron ion stabilizer and the balance with water to prepare pre-acid treatment solution 10.0m 3 , the above ratio units are by weight. (The above raw materials are sold in the market)
[0047] Here, signal EL-11 is used as the drainage aid, N-553 as the corrosion inhibitor, and IRON-2066A as the iron ion stabilizer.
[0048] The fracturing construction is carried out according to the following steps:
[0049] Step 1, such as figure 1 As shown, prepare 4 SS2000 fracturing pump trucks, 1 closed sand mixing t...
Embodiment 3
[0057] Taking Well Yanye Y as an example, the target interval is 1,370 to 1,420 meters, and the interval is black shale in the Chang 7 Member. The mud logging gas logging shows obvious, and there is no productivity after perforation.
[0058] The well was completed with J55 steel grade 5.5-inch casing and liquid CO 2 Sand fracturing.
[0059] Preparation of pre-acid treatment fluid before fracturing 10.0m 3 , the formula is 6.0% HCl, 0.5% drainage aid, 0.3% corrosion inhibitor and 0.2% iron ion stabilizer, the balance is water, and the units of the above ratios are all by weight. (The above raw materials are sold in the market)
[0060] The fracturing construction is carried out according to the following steps:
[0061] Step 1, prepare 6 SS2000 fracturing pump trucks, 1 closed sand mixing pump truck, 1 closed sand mixing truck (volume 5m 3 ), 2 CO 2 Booster pump truck (single maximum displacement 4m 3 / min), 1 instrument car, 1 pressure manifold car, 10 CO 2 Tank car (...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com