Titanium alloy TC4 hot-rolled tube and production method thereof
A titanium alloy and hot-rolled tube technology, applied in the field of titanium alloy tube and its preparation, can solve the problems of difficult processing, difficult processing, no equipment, etc., and achieve the effect of high yield, good surface quality and fast speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0034] Concrete preparation process is as follows:
[0035] 1. Made of TC4 tube blank Graphite emulsion lubricant is added to the inner and outer surfaces of the tube billet, heated online at 950°C for 5 minutes, and then rolled. The rolling deformation in the first pass is 53%, and the rolling speed is 70 times / min. After air cooling, the oxide film and defects are repaired. .
[0036] 2. Add graphite emulsion lubricant to the inner and outer surfaces of the tube billet that comes down from the first pass, heat it online at 900°C for 6 minutes, and then roll it. The rolling deformation in the second pass is 43%, and the rolling speed is 50 times / min. After air-cooling, repair and scrape the oxide film and defects, and twist 60 times on one side.
[0037] 3. Add graphite emulsion lubricant to the inner and outer surfaces of the tube billet in the second pass, heat it online at 800°C for 6 minutes, and carry out rolling. The rolling deformation in the third pass is 42%, and ...
Embodiment 2
[0041] Concrete preparation process is as follows:
[0042] 1. Made of TC4 tube blank The pipe blank is twisted 80 times on one side, the inner and outer surfaces of the tube blank are added with graphite emulsion lubricant, heated online at 1200°C for 25 minutes, and then rolled. The rolling deformation in the first pass is 40.2%, and the finished product is rolled out Rolling speed 60 times / min, pickling after air-cooled alkaline washing
[0043] 3. Finished product Oxidation and annealing at 800°C for 2.5 hours, air cooling, sampling and analysis, the performance was measured as Rm1100MPa, Rp0.2 1010MPa, A 13.5%;
[0044] or, finished Vacuum annealing at 750°C, heat preservation for 2.5 hours, cooling with the furnace, sampling and analysis of its performance measured as Rm1060MPa, Rp0.2 980MPa, A 12%.
Embodiment 3
[0046]Concrete preparation process is as follows:
[0047] 1. Made of TC4 tube blank Add glass powder lubricant to the inner and outer surfaces of the tube blank, heat on-line at 800°C for 5 minutes, and then roll. The rolling deformation in the first pass is 65%, and the rolling speed is 40 times / min. After air cooling, the oxide film and defects are repaired. , twisted 50 times on one side.
[0048] 2. Add glass powder lubricant to the inner and outer surfaces of the tube billet coming down from the first pass, heat it online at 750°C for 8 minutes, and then roll it. The rolling deformation of the second pass is 60%, and the rolling speed is 50 times / min. After air cooling, repair and scrape the oxide film and defects.
[0049] 3. Add glass powder lubricant to the inner and outer surfaces of the tube billet coming down from the second pass, heat it online at 700°C for 10 minutes, and then roll it. The rolling deformation of the third pass is 55%, and the rolling speed is ...
PUM
Property | Measurement | Unit |
---|---|---|
tensile strength | aaaaa | aaaaa |
elongation | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com