A planting net and slope technology, applied in the field of planting net slope protection, can solve the problems of lack of effective components for regulating soil moisture and aggregate structure, low anti-scour effect and moisturizing effect, unscientific construction method, etc. The effect of reducing slope runoff and erosion, reducing engineering costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0012] Embodiment 1: the operation steps are as follows:
[0013] 1) Remove pumice, silt and sundries on the slope to keep the slope smooth.
[0014] 2) Install bolts with specifications of Φ16mm and L100cm at a distance of 1m×1m, fix them with anchoring agent, and reserve 6-8cm of bolt length on the slope.
[0015] 3) Prepare the slope protection matrix, whose component distribution ratio is soil activation powder:soil=5:65 in parts by weight, and mix evenly.
[0016] 4) Spray evenly on the slope Step 3) Slope protection matrix, spray thickness 3-5cm, control bulk density to 1.20-1.40g / cm 3 .
[0017] 5) Lay the planting net on the surface of step 4), and press it lightly so that the planting net is close to the surface of step 4), and tie the bamboo poles with a diameter of 2 to 4 cm along the horizontal direction of the slope to step 2) with tie wire On the anchor rod, and make the bamboo pole press the surface of step 5).
[0018] 6) Watering to make the slope protecti...
Embodiment 2
[0021] Embodiment 2: the operation steps are as follows:
[0022] 1) Remove pumice, silt and sundries on the slope to keep the slope smooth.
[0023] 2) Install anchor rods with specifications of Φ18mm and L120cm on the slope in step 1) at a distance of 1m×1m, and fix them with anchoring agent, and reserve the length of anchor rods on the slope to be 6-8cm.
[0024] 3) Prepare the slope protection matrix, whose component distribution ratio is soil activation powder:soil=3.5:55 in parts by weight, and mix evenly.
[0025] 4) Spray evenly on the slope Step 3) Slope protection matrix, spray thickness 3-5cm, control bulk density to 1.20-1.40g / cm 3 .
[0026] 5) Lay the planting net on the surface of step (4), and press it lightly so that the planting net and the surface of step 4) are close; tie the bamboo poles with a diameter of 2 to 4 cm along the horizontal direction of the slope and fix them in step 2 with tie wire ) on the anchor rod, so that the bamboo pole is pressed ag...
Embodiment 3
[0030] Embodiment 3: the operation steps are as follows:
[0031] 1) Remove pumice, silt and sundries on the slope to keep the slope smooth.
[0032] 2) Install anchor rods with specifications of Φ14mm and L60cm on the slope of step 1), with a spacing of 1m×1m, and fix them with anchoring agent, and reserve the length of anchor rods on the slope to be 6-8cm.
[0033] 3) Prepare the slope protection matrix, whose component distribution ratio is soil activation powder:soil=2:45 in parts by weight, and mix evenly.
[0034] 4) Spray step 3) slope protection matrix evenly on the slope in step 2), spraying thickness 3-5cm, control bulk density to 1.20-1.40g / cm 3 .
[0035] 5) Lay the planting net on the surface of step 4), and press it lightly so that the planting net is close to the surface of step 4), and tie the bamboo poles with a diameter of 2 to 4 cm along the horizontal direction of the slope to step 2) with tie wire On the anchor rod, and make the bamboo pole press the su...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com