Road rigid pile and preloading soft foundation treatment transition structure and construction method
A technology of surcharge preloading and soft foundation treatment, which is applied in the direction of infrastructure engineering, roads, roads, etc., and can solve problems such as uneven subsidence of the roadbed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0039] In the first aspect, the embodiments of the present application provide a transition structure for road rigid piles and piling preloaded soft foundation treatment, please refer to figure 1 , figure 2 and image 3 , the transition structure includes a transition section 200, the transition section 200 is arranged between the rigid pile treatment section 100 and the stacking preload section 300, and the transition section 200 sequentially includes a base rigid pile transition layer 260, a first embankment filling layer from bottom to top and the first pre-pressed layer 210, the base rigid pile transition layer 260 is inserted into the foundation; the first embankment filling layer is laid above the base rigid pile transition layer 260, and the first embankment filling layer includes filling with ordinary The ordinary embankment filling layer 230 of the filler; the first pre-pressed layer 210 is laid above the first embankment filling layer; wherein, the first embankment...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com