Project management system suitable for constructional engineering
A project management system, construction engineering technology, applied in data processing applications, instruments, resources, etc., can solve problems such as delays in construction projects, and achieve the effect of avoiding project delays
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Such as Figure 1-5 As shown, the project management system suitable for construction projects proposed by the present invention includes a management host, and the interior of the management host includes a central processing module 1, an image system 2, a supervision system 3, a security system 4, a data system 5 and a site cleaning system 6 , the communication connection between the central processing module 1 and the image system 2, the image system 2 collects and recognizes the image of the external construction site, the image system 2 transmits the recognized image information to the central processing module 1, the image system 2 includes Image acquisition module 10, image classification module 11 and image recognition module 12;
[0029] The interior of the central processing module 1 includes a project splitting module 7, a deep learning module 8, and a progress coordination module 9. The central processing module 1 carefully splits the engineering project, an...
Embodiment 2
[0036] Such as Figure 1-5As shown, on the basis of Embodiment 1, the data system 5 transmits information to the central processing module 1, and the project splitting module 7 selects the information received from the inside of the data system 5, and the project splitting module 7 performs the project Detailed splitting, the project splitting module 7 transfers the split items to the deep learning module 8;
[0037] The deep learning module 8 performs deep learning according to the split project and the construction time corresponding to the project, so as to divide the weights of each split project, and the deep learning module 8 transmits the allocated data to the progress coordination module 9 , the schedule coordination module 9 allocates the order of the projects according to the overall adjustment;
[0038] The daily work progress image data of the construction project transmitted to the central processing module 1 will be transmitted to the progress coordination modul...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com