Project management system suitable for constructional engineering

A project management system, construction engineering technology, applied in data processing applications, instruments, resources, etc., can solve problems such as delays in construction projects, and achieve the effect of avoiding project delays

Inactive Publication Date: 2022-01-07
NANYANG INST OF TECH
View PDF1 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to solve the shortcoming of the lack of real-time control of the progress of the project in the prior art, which makes the construction project prone to delay, and proposes a project management system suitable for construction projects

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project management system suitable for constructional engineering
  • Project management system suitable for constructional engineering
  • Project management system suitable for constructional engineering

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] Such as Figure 1-5 As shown, the project management system suitable for construction projects proposed by the present invention includes a management host, and the interior of the management host includes a central processing module 1, an image system 2, a supervision system 3, a security system 4, a data system 5 and a site cleaning system 6 , the communication connection between the central processing module 1 and the image system 2, the image system 2 collects and recognizes the image of the external construction site, the image system 2 transmits the recognized image information to the central processing module 1, the image system 2 includes Image acquisition module 10, image classification module 11 and image recognition module 12;

[0029] The interior of the central processing module 1 includes a project splitting module 7, a deep learning module 8, and a progress coordination module 9. The central processing module 1 carefully splits the engineering project, an...

Embodiment 2

[0036] Such as Figure 1-5As shown, on the basis of Embodiment 1, the data system 5 transmits information to the central processing module 1, and the project splitting module 7 selects the information received from the inside of the data system 5, and the project splitting module 7 performs the project Detailed splitting, the project splitting module 7 transfers the split items to the deep learning module 8;

[0037] The deep learning module 8 performs deep learning according to the split project and the construction time corresponding to the project, so as to divide the weights of each split project, and the deep learning module 8 transmits the allocated data to the progress coordination module 9 , the schedule coordination module 9 allocates the order of the projects according to the overall adjustment;

[0038] The daily work progress image data of the construction project transmitted to the central processing module 1 will be transmitted to the progress coordination modul...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a project management system suitable for constructional engineering, and relates to the field of constructional engineering. The technical scheme comprises a management host; the management host internally comprises a central processing module, an image system, a supervision system, a safety system, a data system and a site cleaning system. The central processing module is in communication connection with the image system; the image system is used for acquiring and identifying images of an external construction site; the image system transmits recognized image information to the central processing module; the image system internally comprises an image acquisition module, an image classification module and an image recognition module; the central processing module internally comprises a project splitting module, a deep learning module and a progress coordination module; image data recognized by an image acquisition module, an image classification module and an image recognition module in the image system can be recognized through the site cleaning system; and the site cleaning system scores the environmental sanitation of the construction site according to the image data.

Description

technical field [0001] The invention relates to the technical field of construction engineering, in particular to a project management system suitable for construction engineering. Background technique [0002] Construction engineering refers to the engineering entity formed through the construction of various housing buildings and their ancillary facilities and the installation activities of supporting lines, pipelines and equipment. Among them, "housing construction" refers to projects that have roofs, beams, walls, foundations, and can form internal spaces to meet people's needs for production, living, learning, and public activities. [0003] After retrieval, the invention patent with the Chinese patent number CN112837184A discloses a project management system suitable for construction projects. It establishes a construction safety evaluation index system for common accidents at the construction site, and uses the AHP to determine the index weight. Index evaluation task...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q10/06G06Q50/08
CPCG06Q10/103G06Q10/06393G06Q50/08
Inventor 刘蕊
Owner NANYANG INST OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products