Nitrogen well drilling device and treatment method and application of formation produced water in nitrogen well drilling
A treatment method and technology for producing water, applied in wellbore/well components, earthwork drilling, flushing wellbore, etc., can solve problems such as limiting nitrogen drilling applicability, reducing drilling efficiency, etc., achieving good physical stability and chemical stability. Inertness, improved drilling efficiency, and fast water absorption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0067] 1) Predict the location and volume of water produced in the formation of Well Xin 10-2;
[0068] ① Predict the distribution of water layers by using well logging data and geological data, where the geological data include water saturation, shale volume fraction, resistivity, effective porosity, neutron porosity, irreducible water saturation and permeability;
[0069] It is predicted that there will be formation water produced at the position of 3210 meters in Well Xin 10-2.
[0070] ② Calculate the water produced in the formation by simulation with the following formula,
[0071]
[0072] in,
[0073]
[0074]
[0075] Among them, r w Supply edge radius for the outlet layer, m; h is the thickness of the water layer, m; φ is the effective porosity, %; μ w is formation water viscosity, mPa s; K w is the effective permeability of the water layer, 10 -3 μm 2 ;C w is the effective compressibility coefficient of the water layer, 1 / MPa; ΔP is the bottom hole pr...
Embodiment 2
[0082] 1) Predict the location and volume of water produced in the formation of Well Xin 10-2;
[0083] According to the method of Example 1, it is predicted that there is formation water produced at the position of 3210 meters in Well Xin 10-2, and the calculated formation water production at the position of 3210 meters is 18m 3 / h.
[0084] 2) use figure 1 The device shown performs nitrogen drilling,
[0085] Apparatus according to Example 1.
[0086] 3) Perform the following operations according to the water output:
[0087] put air in figure 1The air compressor of the nitrogen drilling unit then enters the dryer, membrane separation nitrogen generator, supercharger and wellhead equipment successively, and lifts the drilling tool, and the injection rate of nitrogen is 160m 3 / min, turn on the desiccant powder pump 8 on the pipeline between the booster and the wellhead equipment (relative to every m 3 The amount of nitrogen injection, the pumping amount of the desiccan...
Embodiment 3
[0089] 1) Predict the location and volume of water produced in the formation of Well Xin 10-2;
[0090] According to the method of Example 1, it is predicted that there is formation water produced at the position of 3210 meters in Well Xin 10-2, and the calculated formation water production at the position of 3210 meters is 18m 3 / h.
[0091] 2) use figure 1 The device shown performs nitrogen drilling,
[0092] Apparatus according to Example 1.
[0093] 3) Perform the following operations according to the water output:
[0094] put air in figure 1 The air compressor of the nitrogen drilling unit then enters the dryer, membrane separation nitrogen generator, supercharger and wellhead equipment successively, and lifts the drilling tool, and the injection rate of nitrogen is 160m 3 / min, turn on the desiccant powder pump 8 on the pipeline between the booster and the wellhead equipment (relative to every m 3 The amount of nitrogen injection, the pumping amount of the desicca...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com