Correcting method and device for top coal caving control and electronic equipment
A technology for top coal caving and model control, which is applied in mining equipment, earthwork drilling, mine roof support, etc., can solve the problems of low efficiency, poor top coal caving accuracy, and poor precision, so as to improve accuracy and alleviate poor accuracy. , high precision effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] According to an embodiment of the present invention, an embodiment of a correction method for top coal caving control is provided. It should be noted that the steps shown in the flow chart of the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions , and, although a logical order is shown in the flowcharts, in some cases the steps shown or described may be performed in an order different from that shown or described herein.
[0038] figure 1 It is a flow chart of a correction method for top coal caving control according to an embodiment of the present invention, such as figure 1 As shown, the method includes the following steps:
[0039] Step S102, when the top-coal caving support is performing the current top-coal caving operation, obtain the theoretical value and the current actual measurement value of the top-coal caving operation parameter;
[0040] In the embodiment of the present invention, the top-coal cav...
Embodiment 2
[0056] The embodiment of the present invention also provides a correction device for top-coal caving control, the correction device for top-coal caving control is mainly used to implement the correction method for top-coal caving control provided in Embodiment 1 of the present invention, and the following implements the present invention The correction device for top coal caving control provided by the example is introduced in detail.
[0057] Figure 4 It is a schematic diagram of a rectification device for top coal caving control according to an embodiment of the present invention, such as Figure 4 As shown, the device mainly includes: an acquisition module 10, a rectification module 20 and an execution module 30, wherein:
[0058] The acquisition module 10 is used to obtain the theoretical value and current actual measurement value of the top-coal caving operation parameter when the top-coal caving support is performing the current top-coal caving operation;
[0059] The...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com