Beam supporting and column pulling construction method
A construction method and a technique for pulling joists and columns, which are applied in construction, building maintenance, building construction, etc., and can solve problems such as heavy workload and cumbersome procedures for pulling joists and columns
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0045] The following is attached Figure 1-8 The application is described in further detail.
[0046] refer to figure 1 , there is an existing renovation project, which is a circular frame structure. There are four original structural columns 2 distributed in an array at the bottom of the circular structural main beam 1, and original structural beams 3 are respectively connected between the opposite original structural columns 2. The original structure beam 3 intersection position is provided with the column 4 to be pulled out, and now it is necessary to remove the column 4 to be pulled out, so as to increase the usable floor area.
[0047] The embodiment of the present application discloses a construction method for pulling out joist beams and columns. A joist pulling column construction method, comprising the following steps:
[0048] S1. Install hoops and steel beams: refer to figure 2 and image 3 , first install the hoop 5 on the four original structural columns 2, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com