Full-interpenetration construction method based on northern constructional engineering
A technology of construction engineering and construction method
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0050] As an embodiment of the present invention, in step (3), operation is decomposed as follows:
[0051]a. Indoor interspersed process content: actual structural measurement, explosion point closure, indoor drainage engineering, secondary structural engineering, flue installation, plastering engineering, water supply installation, electrical installation, floor heating coil, floor heating backfill, bathroom waterproofing;
[0052] b. The content of the external wall interpenetration process: anti-cracking of the bottom layer of the external wall + leveling putty + real stone paint, air-conditioning panels, protective railings for corridors, door and window engineering, decorative louvers, rainwater and condensation pipes;
[0053] c. Public area interspersed process content: masonry works, plastering works, wall bricks, floor bricks, stair step plastering, stair handrail installation, stairwell and public area ceiling putty, electrical engineering, fire protection engineerin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com