Construction method of expansive soil stratum shield underneath pass railway track

A technology of railway tracks and construction methods, which is applied in underground chambers, earthwork drilling, tunnels, etc., can solve the problems of safety impact of tunnel buildings, instability of excavation surface, poor effect, etc., and achieve reduction of mutual influence and reinforcement The effect of surface soil layer and convenient method

Active Publication Date: 2021-03-16
CHINA RAILWAY TUNNEL GROUP CO LTD +1
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the shield tunneling method has become the preferred tunnel construction method in the field of underground engineering. There are many project cases where the shield machine passes under the railway line. It is important. For underground engineering in expansive soil layers, the development of the project has certain challenges. When the soil loses water excessively, its volume begins to shrink and cracks occur; conversely, when the soil moisture of expansive soil increases , the soil will expand and generate a kind of pressure, which will easily cause water gushing and cause the excavation surface to be unstable, which will eventually have a greater impact on the safety of the tunnel and related buildings
Moreover, most domestic construction methods for shield tunneling projects are to control shield construction parameters, grouting, etc., and the effect is not good

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of expansive soil stratum shield underneath pass railway track
  • Construction method of expansive soil stratum shield underneath pass railway track
  • Construction method of expansive soil stratum shield underneath pass railway track

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] Such as figure 1 , figure 2 as shown, figure 1 It is a flow chart of the construction method for the shield tunneling under the expansive soil layer to pass through the railway track, figure 2 It is a schematic diagram of the shield tunneling under the railway track; the construction method of the shield tunneling under the expansive soil layer of the present invention comprises the steps of:

[0029] S1, using finite element analysis software to simulate engineering;

[0030] S2, improving the expansive soil mass;

[0031] S3, pouring slab isolation foundation under the track;

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of an expansive soil stratum shield underneath pass railway track. The construction method comprises the steps that engineering is simulated through finite element analysis software; an expansive soil body is improved; a plate-shaped isolation foundation is poured below the rail; an erecting device is arranged; the ground and the shield are grouted. According to the invention, the purposes of protecting the track and reducing the influence between the track and the shield can be achieved.

Description

technical field [0001] The invention relates to the technical field of shield tunneling structure construction, in particular to a construction method for tunneling a railway track by a shield tunneling in an expansive soil layer. Background technique [0002] With the rapid development of underground transportation in our country, domestic subway projects are facing some technical problems. At present, the shield tunneling method has become the preferred tunnel construction method in the field of underground engineering. There are many project cases where the shield machine passes under the railway line. It is important. For underground engineering in expansive soil layers, the development of the project has certain challenges. When the soil loses water excessively, its volume begins to shrink and cracks occur; conversely, when the soil moisture of expansive soil increases , the soil will expand and generate a pressure, which will easily cause water gushing and cause the e...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13G06F30/23E21D9/00E21D9/06E21D11/10G06F119/14
CPCG06F30/13G06F30/23E21D9/001E21D9/06E21D9/0671E21D11/10G06F2119/14Y02T90/00
Inventor 刘志涛高明刘洋范小光陈念彭瑞臣刘旭鹏金航孙亮库红艳
Owner CHINA RAILWAY TUNNEL GROUP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products