Throttling-free multistage layered fracturing pipe column and multistage layered fracturing construction method
A layer-fracturing, unthrottled technology, applied in the fields of fluid production, earth-moving drilling, wellbore/well components, etc., which can solve the problems of incomplete unsealing, reduced sand conveying efficiency, and impossible complete recovery of rubber cylinders. , to improve safety, avoid flow restriction, and meet the effect of large-scale fracturing construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Such as figure 1Shown is an unrestricted N+1 staged fracturing string assembled by taking N+1 staged fracturing in a 5-1 / 2″ production casing as an example, including sequentially passing through 2-7 / Bell mouth A connected to the 8″ tubing, the first unthrottled self-unpacking packer B, the first unthrottled sandblasting sleeve C, the second unthrottled self-unpacking packer B, the second level Unrestricted sandblasting sleeve D, Nth unrestricted self-service unpacking packer B, Nth unrestricted unrestricted sandblasting sleeve E, N+1 unrestricted self-service unpacking packer B, sand control Hydraulic anchor F, hydraulic safety joint G, tubing hanger, and the oil distance compensation pipe string connected to the tubing hanger; wherein,
[0040] The inner diameter of the outer cylinder and the wall thickness of the inner cylinder in the unrestricted sandblasting sliding sleeves at all levels are consistent, and the inner diameter of the inner cylinder increases step ...
Embodiment 2
[0075] A construction method for multi-stage layered fracturing in one trip by using the unthrottled multi-stage layered fracturing string in Embodiment 1, the steps are as follows:
[0076] S1. According to the reservoir conditions in the oil and gas well, assemble the unthrottled multi-stage layered fracturing string and run it into the production casing, so that except for the bottommost reservoir section in the oil and gas well, the position of each reservoir section is respectively in line with each The sandblasting holes of the non-throttling sandblasting sliding sleeve correspond one by one, and the bell mouth is set above the bottom reservoir section;
[0077] S2. Open the casing valve, replace the pre-fluid into the oil pipe, and then close the casing valve; wherein, the amount of pre-fluid is consistent with the internal volume of the oil pipe, and the displacement is ≤0.5m 3 / min;
[0078] S3. Pressurize the tubing, and the pressure acts on the power piston 71 thro...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com