Soft soil layer foundation pit side slope anchor rod drilling device

A drilling device and a technology for the edge of the foundation pit, which are applied in the directions of earthwork drilling, drilling equipment and methods, drill pipes, etc., can solve the problems of soil cracking around the foundation pit, slow construction speed, and high construction cost, and are not easy to collapse. The effect of hole, convenient movement and economical construction cost

Active Publication Date: 2020-08-18
HEBEI ROAD & BRIDGE GROUP
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The traditional soil nailing wall slope protection construction drilling equipment uses a crawler-type screw bolt drill. During the drilling process in soft soil layers, the construction speed is slow, the dust is large and the construction cost is high. Often, the foundation pit cannot be closed in time after excavation. The soil around the foundation pit is prone to cracking or even slipping after rain
Therefore, in the construction process of soil nailing wall protection for slopes in soft soil layers, the traditional screw bolt drilling rig has certain limitations in terms of construction speed, environmental protection and cost.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Soft soil layer foundation pit side slope anchor rod drilling device
  • Soft soil layer foundation pit side slope anchor rod drilling device
  • Soft soil layer foundation pit side slope anchor rod drilling device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] as attached Figure 1-4 As shown, the present invention includes a mounting bracket 2 installed on the breaking hammer head 1 of a hydraulic breaker, a first mounting plate 4 arranged at the bottom of the mounting bracket 2, and a steel pipe 5 installed on the first mounting plate 4 for drilling . The mounting bracket 2 is composed of several angle irons, the upper ends of which are welded or screwed on the crushing hammer 1, the first mounting plate 4 is installed on the lower end of the mounting bracket 2, and the lower end of the steel pipe 5 is sharpened to facilitate drilling. Its top is fixedly connected with the first mounting plate 4 .

[0019] A stepped blind hole 6 for matching with the top of the steel pipe 5 is provided on the first mounting plate 4, a through hole 7 is provided at the top of the stepped blind hole 6, and a threaded hole is correspondingly provided at the top of the steel pipe 5, when the steel pipe 5 When it needs to be connected with the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a soft soil layer foundation pit side slope anchor rod drilling device. The soft soil layer foundation pit side slope anchor rod drilling device comprises a mounting bracket arranged on a breaking hammer head of a hydraulic breaking hammer, a first mounting plate arranged at the bottom of the mounting bracket and a steel pipe arranged on the first mounting plate and used for drilling. The steel pipe is arranged on the breaking hammer head of the hydraulic breaking hammer to form a drill rod, and the hydraulic function of the breaking hammer head is used for ejecting the steel pipe into a soil layer, and a hole is formed after the steel pipe reaches the design depth. The soft soil layer foundation pit side slope anchor rod drilling device is suitable for soft soil layer side slopes.

Description

technical field [0001] The invention relates to the field of building construction equipment, in particular to a soft soil foundation pit side slope bolt drilling device. Background technique [0002] The traditional soil nailing wall slope protection construction drilling equipment uses a crawler-type screw bolt drill. During the drilling process in soft soil layers, the construction speed is slow, the dust is large and the construction cost is high. Often, the foundation pit cannot be closed in time after excavation. Cracking or even slipping of the soil around the foundation pit is prone to occur after rain. Therefore, in the construction process of soil nailing wall protection for slopes in soft soil layers, the traditional screw bolt drilling rig has certain limitations in terms of construction speed, environmental protection and cost. Contents of the invention [0003] The technical problem to be solved by the present invention is to provide a soft soil layer founda...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21B17/03E21B1/00E21B17/00E02D5/74E02D17/04E02D17/20
CPCE02D5/74E02D17/04E02D17/20E21B1/02E21B17/00E21B17/03
Inventor 刘志伟王凯峰杨静张智涛周军平张永梅贺伟强杨溶韩长江雷錾李树根辛传盛穆传龙赵彦群张毅张肖郭建磊吕江卫董树英
Owner HEBEI ROAD & BRIDGE GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products