Anti-scouring device suitable for pile foundation of pile group in water and construction method thereof

A construction method and anti-scour technology, applied in protection devices, infrastructure engineering, construction, etc., can solve problems such as the impact on the safety and stability of the bridge, the impact on the safety and stability of the bridge, and the reduction of the effective embedding depth, so as to improve the bearing capacity. Strength, simple and quick construction, and the effect of suppressing damage

Active Publication Date: 2020-06-30
CHONGQING UNIV +1
View PDF7 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The formation and movement of the horseshoe-shaped vortex and wake vortex enhance the transport capacity of the surface material of the river bed, thus forming obvious local scour pits in the bridge pile foundation, which will reduce the effective embedding depth of the bridge pile foundation in the subsoil soil, As a result, the bearing capacity of the pile foundation decreases, which greatly affects the safety and stability of the bridge, and in mountainous cities, the water flow velocity is greater, and the impact of water scour on the safety and stability of the bridge will be even greater.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Anti-scouring device suitable for pile foundation of pile group in water and construction method thereof
  • Anti-scouring device suitable for pile foundation of pile group in water and construction method thereof
  • Anti-scouring device suitable for pile foundation of pile group in water and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0043] This embodiment discloses an anti-scouring pit device suitable for group pile foundations in water, which includes a flexible cap 1 and a reinforced concrete fixed structure 2 arranged in the foundation soil layer 4 at the bottom of the bed.

[0044] see figure 1 Or 3, the flexible platform 1 is in the shape of a square platform, the flexible platform 1 is made of high-strength plastic, the interior of the flexible platform 1 is hollow, and the hollow part is marked as a cavity S. see image 3 The flexible cap 1 is provided with a number of pile holes 101 for the pile foundation 3 to pass through. The pile holes 101 run through the upper and lower surfaces of the flexible cap 1. The upper surface of the flexible cap 1 is provided with a number of reserved holes 102. The undisturbed soil of the bed flows into the cavity S through several reserved holes 102 .

[0045] see Figure 4 , the reinforced concrete fixed structure 2 is in the shape of a cuboid, and the heights...

Embodiment 2

[0049] This embodiment discloses an anti-scouring pit device suitable for group pile foundations in water, which includes a flexible cap 1 and a reinforced concrete fixed structure 2 arranged in the foundation soil layer 4 at the bottom of the bed.

[0050] see Figure 5 , the flexible platform 1 is in the shape of a square platform, and the flexible platform 1 is formed by splicing several assembly parts 103 through a mortise and tenon structure. The upper surface of each assembly 103 is provided with reserved holes 102 , and the undisturbed soil of the substratum flows into the cavity S through the reserved holes 102 .

[0051]The assembly 103 is made of fiber material, and the inside of the assembly 103 is hollow, and the hollow part is marked as cavity S. Several assemblies 103 are cut longitudinally from a complete quadrangular platform, and the cutting surface of the assembly 103 is provided with several semicircular grooves 1011, and the semicircular grooves 1011 of se...

Embodiment 3

[0058] Based on the anti-scour pit device for group pile foundations described in Embodiment 1, this embodiment discloses a construction method for the device, including the following steps:

[0059] 1) Make the matching flexible platform 1 and reinforced concrete fixed structure 2. Wherein, the reinforced concrete fixed structure 2 is equipped with tensile steel bars.

[0060] 2) For unbuilt bridges, a pre-buried pit is excavated on the upper surface of the foundation soil layer 4 at the bottom of the bed. Wherein, several of the pile foundations 3 that have been poured pass through the pre-buried pit, and the size of the pre-buried pit matches the size of the reinforced concrete fixed structure 2 . The undisturbed soil of the substratum obtained by excavating the pre-buried pit will be poured into the cavity S later, so as to realize local material collection.

[0061] 3) On a horizontal plane, several pile foundations 3 pass through several pile holes 101 along the top. ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Heightaaaaaaaaaa
Login to view more

Abstract

The invention discloses an anti-scouring device suitable for a pile foundation of a pile group in water and a construction method thereof, and relates to the technical field of bridge pile foundationreinforcement. The anti-scouring device suitable for the pile foundation of the pile group in water comprises a flexible bearing platform and a reinforced concrete fixing structure which are arrangedin a bed bottom foundation soil layer. The flexible bearing platform is a hollow quadrangular frustum pyramid, the hollow part of the flexible bearing platform is filled with sand and gravel, and theflexible bearing platform is arranged at the bottom of the pile group in a sleeving mode through a plurality of pile holes. The reinforced concrete fixing structure is provided with a special-shaped hole matched with the flexible bearing platform in shape, the flexible bearing platform is embedded into the special-shaped hole, and the anti-scouring device for the pile foundation of the pile groupis formed. According to the anti-scouring device suitable for the pile foundation of the pile group in water and the construction method thereof, damage of horseshoe-shaped vortexes and trailing vortexes to the pile foundation can be effectively inhibited, the contact part of the device and the pile foundation can protect the pile foundation from being scoured and corroded by water, and the bearing capacity of the pile foundation of the pile group is improved; and meanwhile, the anti-scouring device suitable for the pile foundation of the pile group in water is suitable for a built bridge pilefoundation and an unexpanded bridge pile foundation, and has the characteristics of being simple and rapid in construction, low in cost, safe and environmentally friendly.

Description

technical field [0001] The invention relates to the technical field of bridge pile foundation reinforcement. Background technique [0002] In recent years, my country's economy has developed rapidly, and a large number of large bridges across large rivers, such as the Hong Kong-Zhuhai-Macao Bridge, the Donghai Bridge, the Hangzhou Bay Bridge, and the Lijiatuo Bridge in Chongqing, have been built immediately. Most of these river-crossing bridges adopt deep-water pile group foundations, and their volume and water-blocking area are relatively large. The safety and stability of bridge pile foundations in complex water flow environments not only depend on their stress conditions in complex water environment, but also are related to the shallowing of bridge pile foundations caused by water erosion, which leads to the reduction of pile foundation bearing capacity. And a large number of investigation and statistical results also show that one of the main reasons for bridge damage i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D27/12E02D27/14E02D27/52E02D31/00E02D31/06
CPCE02D27/12E02D27/14E02D27/52E02D31/00E02D31/06
Inventor 周航王增亮丁选明吴岱峰蒋鑫刘冒佚唐毅胡涛张卢喻
Owner CHONGQING UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products