A combined structure and combined column technology, which is applied in the direction of buildings, building components, building structures, etc., can solve the problems of inconvenient joint connection and low bending bearing capacity of round steel columns, so as to ensure the quality of pouring and improve the connection efficiency , The effect of increasing the force arm
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0074] Such as Figure 1-Figure 4 As shown, a composite column 30 provided in this embodiment includes a round steel pipe 31 and 2-4 T-shaped steels 32; the round steel pipe 31 is poured with concrete 33, and a plurality of T-shaped steels 32 are spaced along the circumferential direction of the round steel pipe 31. Set, and the opposite end of the T-shaped steel 32 web and the flange is fixedly connected to the outer wall of the round steel pipe 31; the web 32b of the T-shaped steel 32 is located on the extension line of the diameter of the round steel pipe 31, and the flange 32a is provided with bolt holes.
[0075] Among them, several T-shaped steel 32 are arranged in various ways, such as figure 1 As shown, there are two T-shaped steels 32, and the webs of the two T-shaped steels 32 are located on the same diameter of the round steel pipe 31 to form a straight shape. Such as image 3 As shown, there are two T-shaped steels 32, and the webs of the two T-shaped steels 32 a...
Embodiment 2
[0079] This embodiment discloses a composite structure building, which includes beams, columns, shear walls and floors. Wherein the column is the combined column 30 in Example 1.
[0080] Such as Figure 5 As shown, the combined column 30 is embedded in the wall 4 as a column; the T-shaped steel flange on the outdoor side of the combined column 30 is the outer flange 3a, and the outer flange 3a is arranged parallel to the wall surface of the wall 4; The outer end face of the outer flange 3a is coated with an outer anti-corrosion layer (not shown); the outer side of the anti-corrosion layer of the outer flange is laid with several layers of glass wool boards 10, which are used to block the combined column 30 as a thermal bridge in the interior of the wall. Transfer heat flow between the outer sides.
[0081] While effectively eliminating the thermal bridge effect at the combined column 30 and improving the overall thermal insulation performance of the building, several layers...
Embodiment 3
[0096] This embodiment discloses a composite structure building, which is different from Embodiment 4 in that the beam in this embodiment is a partially clad steel-concrete composite member.
[0097] Such as Figure 6 and Figure 7 As shown, the partially clad steel-concrete composite member in this embodiment includes: first side steel plate 100, second side steel plate 200, stud 500, repair welding steel plate 400, stiffening steel plate 300, steel skeleton 600 and concrete 700.
[0098] The first side steel plate 100 and the second side steel plate 200 are arranged in parallel and spaced; It is fixedly connected with the second side steel plate 200.
[0099] The two stiffened steel plates 300 divide the partly clad steel-concrete composite member into the connection area A1 on the outside of the two stiffened steel plates 300, and the prefabricated area A2 between the two stiffened steel plates 300; the two stiffened steel plates 300 and the first side steel plate 100 an...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com