Connecting system between steel frame and prefabricated wall plate and manufacturing method
A prefabricated wall panel and connection system technology, applied to walls, building components, building insulation materials, etc., can solve the problems of prefabricated wall panels such as heavy weight and volume, difficult to guarantee construction quality, and no assembly construction, etc., to achieve simple production methods Convenience, improvement of waterproof and heat insulation performance, and weight reduction effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] Such as Figure 1-8 As shown, a connection system between a steel frame and a prefabricated wall panel includes a steel frame 1, a prefabricated wall panel 2, and a connecting piece. In this embodiment, each component and the connection mode of each component in the system are described in detail.
[0051] steel frame 1
[0052] Such as Figure 5 As shown, the steel frame 1 includes two vertical steel columns 101 and two horizontal steel beams 102 , and the two horizontal steel beams 102 are vertically arranged between the two vertical steel columns 101 . The vertical steel column 101 is a square steel pipe column, the width and thickness of the column section are 400 mm and 14 mm, respectively, and the horizontal steel beam 102 is an H-shaped horizontal steel beam 102. The beam height, beam width, web thickness, and flange thickness are respectively 400mm, 200mm, 8mm, 13mm. Take two adjacent horizontal steel beams 102 as an example.
[0053] Precast wall panels 2 ...
Embodiment 2
[0072] The manufacturing method of the system connecting the steel frame 1 and the prefabricated wall panel 2 in embodiment 1 comprises the following steps:
[0073] S1. Make C-shaped steel and open holes, assemble the C-shaped steel into the wall panel joist frame, set the keel reinforcement 204 on the corresponding position of the wall panel joist frame, and fix one end of the inner wire sleeve 401 with the anchor plate 402 to form a pre-embedded Part 4, the inner wire sleeve 401 passes through the hole in the corresponding position of the keel reinforcement 204 and the C-shaped steel 201, and the PVC pipe 6 is arranged inside the junction of the two C-shaped steels at the upper end of the wall panel keel, as a prefabricated wall. The hoisting hole of the panel 2 is placed in the mould, and the light polymer is poured to form the prefabricated wall panel 2; the horizontal steel beam 102 and the vertical steel column 101 are assembled to form the steel frame 1; the first conne...
PUM
Property | Measurement | Unit |
---|---|---|
Density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com