Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Optimization method of active distribution system dispatching in industrial parks considering the demand of peak load regulation

A technology for active power distribution and industrial parks, applied in the fields of flexible AC power transmission systems, energy industry, photovoltaic power generation, etc. Long-term safe and economical operation of power system and other issues

Active Publication Date: 2018-12-28
HEFEI UNIV OF TECH
View PDF1 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The existing optimal dispatching methods for active power distribution systems are mainly divided into two categories. One is to use genetic algorithm, biogeographic optimization algorithm, particle swarm optimization algorithm and other optimization algorithms without considering the randomness of new energy output and load demand. The optimal scheduling problem of the active power distribution system is solved strategically, but the uncertainty of new energy output and load demand is ubiquitous and unavoidable. It will be difficult to guarantee the long-term safe and economic operation of the active power distribution system if the optimal control strategy is used as the benchmark value; the other is to predict the uncertainty of new energy output and load demand through time series, neural network, combined forecasting and other deterministic forecasting methods. Forecasting, transforming the uncertain optimal scheduling problem into a deterministic problem to solve the corresponding strategy, this type of method is to predict the new energy output and load demand at a certain moment, without taking into account the external environment and user demand. Strong randomness, the forecast of new energy output and load demand within a day can be regarded as a multi-period dynamic change process in essence, and has a strong temporal correlation between each time period. At the same time, the optimization strategy obtained by this type of method does not Taking into account the impact of unexpected uncertainties of the environment and users

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Optimization method of active distribution system dispatching in industrial parks considering the demand of peak load regulation
  • Optimization method of active distribution system dispatching in industrial parks considering the demand of peak load regulation
  • Optimization method of active distribution system dispatching in industrial parks considering the demand of peak load regulation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0098] In this embodiment, the scheduling optimization method for the active power distribution system in industrial parks considering the peak load regulation requirements of the power grid is applied to such as figure 1 The active power distribution system of the industrial park shown includes: photovoltaic power generation unit PV, all-vanadium redox flow battery energy storage system VRB and industrial loads. Industrial loads include rigid loads and flexible loads. Flexible loads include curtailable loads and transferable loads. And the load can be shifted; the active power distribution system of the industrial park is connected to the power grid through a public node, which can receive real-time peak-shaving demand instructions issued by the power grid dispatching trading center, and can interact with the power grid for power purchase and sale according to the industrial time-of-use electricity price. Considering the stochastic uncertainty and timing correlation of photovo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an optimization method of active distribution system dispatching in industrial parks considering the demand of peak load regulation. The photovoltaic power generation unit PV,the vanadium flow battery energy storage system VRB and the industrial load are used as the active distribution system dispatching units in the industrial park, which participated in the considering of peak load regulation, and the physical models of each dispatching unit are established. The DTMDP model is established to solve the dynamic dispatching optimization problem of active distribution system in industrial parks considering the demand of peak load regulation. The Q-learning algorithm based on simulated annealing is used to solve the DTMDP model, and the optimal control strategy is used to guide the system to choose the reasonable action plan in the actual operation process and realize the system scheduling optimization. The invention can effectively solve the problem of peak shaving demand of the power network under the condition of considering the randomness of the source and the load, promote the local absorption of new energy, and improve the operation economy of the activedistribution system and the operation stability of the power system.

Description

technical field [0001] The invention relates to the field of optimal dispatching of active power distribution systems, and specifically relates to a scheduling optimization method for active power distribution systems in industrial parks in consideration of the randomness of both sides of the source and load, considering the peak regulation requirements of the power grid. Background technique [0002] With the increasing penetration rate of new energy and the scale of controllable load, the situation of power grid peak shaving is becoming more and more severe, and the distributed characteristics of distribution network are becoming more and more obvious. Active power distribution system with active control and active management of flexible load and energy storage. Effective use of the interaction between distributed energy and loads in the active power distribution system, on the one hand, can realize the safe and economical operation of the system itself, and on the other h...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H02J3/32H02J3/38
CPCH02J3/383H02J3/32H02J2203/20Y02E10/56Y02E40/10Y02P80/10
Inventor 唐昊刘畅余璟汤必强许丹杨明吕凯
Owner HEFEI UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products