Zero-defect construction method for secondary lining of tunnel
A secondary lining and construction method technology, applied in tunnel lining, tunnel, shaft lining, etc., can solve the problems of heavy workload, troublesome, cumbersome processing, etc., and achieve the effect of ensuring zero defects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0018] The technical solutions of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative work, any modifications, equivalent replacements, improvements, etc., shall be included in the protection scope of the present invention Inside.
[0019] The tunnel secondary lining zero-defect construction method of the present invention comprises the following steps:
[0020] S1. To control the quality of smooth blasting, drillers are monitored and controlled on-site to drill holes according to the layout points of the blastholes; after each cycle of blasting, the profiler is used to measure the excavation contour, and the overcut amount of each cycle is calculated ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com