Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Bolt splicing axis bendable all-prefabricated splicing open excavated cable tunnel

A prefabricated assembly and cable tunnel technology, which is used in cable installation, cable installation in tunnels, water conservancy projects, etc. Insufficient wall flatness and other problems to achieve the effect of improving connection quality, reducing on-site workload and short operation cycle

Pending Publication Date: 2018-08-28
POWERCHINA FUJIAN ELECTRIC POWER SURVEY & DESIGN INST CO LTD +2
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This type of cable tunnel using the cast-in-place process has many on-site procedures before pouring, including cushioning, tie bars, mold building, waterproof gaps, installation of grounding embedded parts, installation of bracket embedded parts, main structure pouring, concrete curing, demolition, etc. Formwork and other processes, and the formation of a tunnel cross-section structure needs to be divided into at least two pourings, and the construction period of the on-site operation is at least more than 40 days. At the same time, the quality of the concrete cured on site is affected by the weather, and there are also certain differences.
On the other hand, due to the unevenness of the formwork or other reasons, the concrete poured on site will lead to insufficient flatness of the side wall of the cable tunnel, which will affect the installation of subsequent supports and equipment. Therefore, the quality is greatly affected by the construction quality, and the side wall is often uneven. It is impossible to install the equipment support; at the same time, the on-site construction period is long, not only the construction period is difficult to control, but also the overall quality of the structure is easily affected by the weather, and the overall quality and construction period of the project are difficult to control

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bolt splicing axis bendable all-prefabricated splicing open excavated cable tunnel
  • Bolt splicing axis bendable all-prefabricated splicing open excavated cable tunnel
  • Bolt splicing axis bendable all-prefabricated splicing open excavated cable tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] Best practice:

[0027] The fully prefabricated assembled open-cut cable tunnel with bolt splicing axis is bendable, which is composed of multiple sections of cable prefabricated tunnels, including standard section tunnels and curved section tunnels, and each section of cable prefabricated tunnel includes a return type tunnel body 1. Grounding system and a support system; the back-shaped tunnel body 1 includes a bottom plate, a top plate and two side walls, and the cross section is a back-shaped structure; the back-shaped tunnel body includes a cable erection space and a pedestrian maintenance passage formed by a cantilever cross bracket; the following Further elaboration according to the spatial arrangement in the tunnel body:

[0028] Refer to attached figure 1 , 2 , 5. Fully prefabricated assembled open-cut cable tunnel arranged on one side. The support system includes a trough member 2 and a cantilever cross support 3. The trough member 2 is pre-embedded in one si...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a cable tunnel structure of a power transmission line, in particular to a bolt splicing axis bendable all-prefabricated splicing open excavated cable tunnel. The cable tunnelis structurally characterized in that the cable tunnel is formed by splicing a plurality of cable prefabricated tunnel sections and comprises the standard tunnel section and the bending tunnel sections; each cable prefabricated tunnel section comprises a concentric-square-shaped tunnel body, a grounding system and a support system; each support system comprises a groove type component and suspension arm transverse supports; the groove type components are embedded and distributed in the sidewalls of the concentric-square-shaped tunnel bodies; the suspension arm transverse supports are fixedly connected with the corresponding groove type components through bolts; each grounding system comprises an outer grounding steel ring, an inner grounding ring and connecting parts connecting the outer grounding steel ring with the inner grounding ring; the inner grounding rings are connected with the groove type components embedded in the support systems; each concentric-square-shaped tunnel body comprises a cable erection space composed of the suspension arm transverse supports and a walking maintenance channel; every two adjacent cable prefabricated tunnel sections are connected through double-end bending bolts. The cable tunnel structure has the advantages that the workload of field construction is greatly reduced; the construction quality is improved; the cable tunnel structure is convenient and fast to use and is hardly affected by weather; the construction period is controlled easily; the operation cycle is short.

Description

technical field [0001] The invention relates to a cable tunnel structure in a power transmission line, in particular to a fully prefabricated and assembled open-cut cable tunnel with a bendable axis of bolt splicing. Background technique [0002] In power transmission lines, the existing open-cut cable tunnels mainly use cast-in-place construction to form the main structure. Reasonably set up grounding and support systems in different stages of the aforementioned process. This type of cable tunnel using the cast-in-place process has many on-site procedures before pouring, including cushioning, tie bars, mold building, waterproof gaps, installation of grounding embedded parts, installation of bracket embedded parts, main structure pouring, concrete curing, demolition, etc. Formwork and other processes, and the formation of a tunnel cross-section structure needs to be divided into at least two pourings, and the construction period of the on-site operation is at least more tha...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D29/045H02G9/08
CPCH02G9/08E02D29/10E02D2600/20E02D2300/002
Inventor 陈孝湘陈金发刘沁魏志强郑宁敏唐自强郑奋林叶桂中吴勤斌刘志伟江能明武奋前王冶林昌熔林宇彬李宏进吴培贵
Owner POWERCHINA FUJIAN ELECTRIC POWER SURVEY & DESIGN INST CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products