Reinforced concrete shear wall with positioning prefabricated member inside and construction method of reinforced concrete shear wall

A technology of reinforced concrete and prefabricated parts, which is applied in the direction of manufacturing tools, walls, and building components. It can solve the problems of inaccurate protective layer thickness, easy formwork bulging, poor positioning of steel bars, etc., and achieves convenient mold installation and combination, and demoulding Rapid, Strength-Increasing Effects

Active Publication Date: 2016-08-24
ZHONGDA CONSTR
View PDF14 Cites 25 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to propose a reinforced concrete shear wall with built-in positioning prefabricated parts for the existing reinforced concrete shear wall and its construction methods, such as poor positioning of steel bars, inaccurate thickness of the protective layer, and easy formwork bulging of the formwork. and construction methods, in the construction of reinforced concrete shear walls, vertical ladder bars and horizontal ladder bars are used as the positioning support frame for the binding of steel bars, and the positioning prefabricated parts are clamped into the horizontal and vertical distribution bars to ensure the thickness of the protective layer and strengthen the steel mesh at the same time Assembled steel formwork is installed on both sides of the steel mesh piece, and the tensioning screw is passed through the connecting steel pipe and fastened by bolts. The diagonal brace of the steel formwork is connected to the embedded part of the floor structure, and finally concrete is poured to form a shear wall structure.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Reinforced concrete shear wall with positioning prefabricated member inside and construction method of reinforced concrete shear wall
  • Reinforced concrete shear wall with positioning prefabricated member inside and construction method of reinforced concrete shear wall
  • Reinforced concrete shear wall with positioning prefabricated member inside and construction method of reinforced concrete shear wall

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The present invention will be further described in detail below with reference to the accompanying drawings and examples. The following examples are explanations of the present invention and are not limited to the following examples.

[0035] figure 1 It is the construction drawing of reinforced concrete shear wall formwork pouring concrete, figure 2 is a schematic diagram of the three-dimensional structure of the horizontal ladder bars and vertical ladder bars, image 3 is the positioning diagram of vertical ladder bars, Figure 4 It is a schematic diagram of the structure of the embedded parts of the floor slab, Figure 5 is a schematic diagram of the positioning prefab structure, Figure 6 is the plan view of the positioning prefab mold, Figure 7 is the vertical section view of the positioning prefabricated part, refer to Figure 1-7 As shown, the construction process mainly includes the processing and production of prefabricated parts, the setting of embedded...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a reinforced concrete shear wall with a positioning prefabricated member inside and a construction method of the reinforced concrete shear wall. The construction method includes: manufacturing the prefabricated member; arranging the prefabricated member on a floor slab structure; making positioning ladder rebars; binding rebars; mounting the prefabricated member; mounting steel formworks; setting up a steel formwork inclined strut. During constructing the reinforced concrete shear wall, vertical ladder rebars and horizontal ladder rebars are adopted as a positioning supporting frame for rebar binding, and the positioning prefabricated member is clamped in horizontally-vertically-distributed rebars, so that thickness of a protection layer is guaranteed and connection of rebar nets is enhanced; the assembly steel formworks are arranged on two sides of the rebar nets, oppositely-puling threaded rods penetrate connecting steel pipes to be fastened on embedded members of the steel formwork inclined strut and the floor slab structure through screws, and concrete is poured to form a shear wall structure. By using the construction method, construction site order and construction efficiency are improved, related measures guarantee construction quality of the shear wall, rebar positioning accuracy and thickness accuracy of the protection layer are improved remarkably, and the construction method has good technical and economic benefit.

Description

technical field [0001] The invention relates to a reinforced concrete shear wall with a built-in positioning prefabricated part and a construction method thereof, which is suitable for the construction of a reinforced concrete shear wall in frame shear wall structures of industrial and civil buildings. Background technique [0002] The anti-seismic fortification of buildings is the first line of defense to ensure the safety of people's lives and properties. Since the Wenchuan earthquake, the "Code for Seismic Design of Buildings" (GB50011-2010) has improved the anti-seismic fortification intensity of buildings in earthquake-prone areas. Increase the seismic level accordingly. Engineering practice shows that the frame-shear wall structure of high-rise buildings has excellent seismic performance, and the shear wall structure can provide strong horizontal force resistance when an earthquake occurs, thereby ensuring the safety of the building. [0003] The construction quality ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04B2/84E04B1/41E04C5/20E04G11/08B28B7/00
CPCB28B7/0029E04B1/41E04B2/84E04C5/20E04G11/08
Inventor 彭国禄
Owner ZHONGDA CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products